Increasing the Efficiency of Wiring Harness Production Using the Rangked Positional Weight and Largest Candidate Rule Methods
Peningkatan Efisiensi Produksi Wiring Harness Dengan Metode Rangked Positional Weight dan Largest Candidate Rule
DOI:
https://doi.org/10.21070/ups.3087Keywords:
Wiring Harness, Efficiency, Line Balancing, Ranked Positional Weight, Largest Candidate RuleAbstract
In the production of wiring harness doors, there was a problem with not achieving the production target of 6.19% or 6.15 units in January 2023. This was caused by differences in production output at each work station which resulted in overlapping. Line balancing is carried out by measuring working time in each wiring harness production on the man power production line using a stopwatch. The aim of this research is to determine the optimum production line for wiring harnesses and to increase production efficiency for wiring harnesses according to the target line efficiency. The method used is the ranked positional weight and the largest candidate rule. The results of the analysis of the ranked positional weight method and the largest candidate rule method obtained an efficiency value of 96.33%, the resulting output is 144.5 wiring haness units with 12 work stations. These results are better than before using both methods.
Downloads
References
H. G. Nguyen, M. Kuhn, And J. Franke, “Manufacturing Automation For Automotive Wiring Harnesses,” Procedia Cirp, Vol. 97, Pp. 379–384, 2020, Doi: 10.1016/J.Procir.2020.05.254.
L. L. Tobing, E. S. Nugroho, And S. Solehudin, “Pengaruh Motivasi, Pelatihan Dan Pengembangan Terhadap Kinerja Karyawan Pada Level Operator Di Pt. Subang Autocomp Indonesia,” Syntax Lit. ; J. Ilm. Indones., Vol. 6, No. 1, P. 274, 2021, Doi: 10.36418/Syntax-Literate.V6i1.2000.
C. Hemalatha, K. Sankaranarayanasamy, And N. Durairaaj, “Lean And Agile Manufacturing For Work-In-Process (Wip) Control,” Mater. Today Proc., Vol. 46, Pp. 10334–10338, 2021, Doi: 10.1016/J.Matpr.2020.12.473.
I. Minarsih And L. R. Waluyati, “Efisiensi Produksi Pada Usahatani Bawang Merah Di Kabupaten Madiun,” J. Ekon. Pertan. Dan Agribisnis, Vol. 3, No. 1, Pp. 128–137, 2019, Doi: 10.21776/Ub.Jepa.2019.003.01.13.
Y. Yujianto, N. M. Sudri, L. Theresia, And Y. Widianty, “Meningkatkan Efisiensi Proses Produksi Pada Industri Tekstil Dengan Data Envelopment Analysis,” J. Iptek, Vol. 3, No. 2, Pp. 239–244, 2019, Doi: 10.31543/Jii.V3i2.154.
A. T. Panudju, B. S. Panulisan, And E. Fajriati, “Analisis Penerapan Konsep Penyeimbangan Lini (Line Balancing) Dengan Metode Ranked Position Weight (Rpw) Pada Sistem Produksi Penyamakan Kulit Di Pt. Tong Hong Tannery Indonesia Serang Banten,” J. Integr. Sist. Ind., Vol. 5, No. 2, Pp. 70–80, 2018.
T. Regina, J. A. Luin, And G. D. Rembulan, “Mengurangi Keterlambatan Waktu Produksi Menggunakan Line Balancing Pada Sektor Konstruksi Jalan Tol,” Pros. Semin. Nas. Ris. Dan Teknol., Pp. 258–263, 2020.
I. Purnamasari And A. S. Cahyana, “Line Balancing Dengan Metode Ranked Position Weight ( Rpw),” Spektrum Ind., Vol. 13, No. 2, P. 157, 2015, Doi: 10.12928/Si.V13i2.2693.
M. Djunaidi And . A., “Analisis Keseimbangan Lintasan (Line Balancing) Pada Proses Perakitan Body Bus Pada Karoseri Guna Meningkatkan Efisiensi Lintasan,” J. Ilm. Tek. Ind., Vol. 5, No. 2, Pp. 77–84, 2018, Doi: 10.24912/Jitiuntar.V5i2.1788.
H. L. Afrian, R. Alfatiyah, And K. Subarman, “Perbaikan Sistem Produksi Dengan Metode Time Study Dan Line Balancing Untuk Efisiensi Proses Pengemasan Pada Cv. Tirta Sasmita,” Teknologi, Vol. 3, No. 1, Pp. 73–81, 2020.
M. Basuki, H. Mz, S. Aprilyanti, And M. Junaidi, “Perancangan Sistem Keseimbangan Lintasan Produksi Dengan Pendekatan Metode Heuristik,” J. Teknol., Vol. 11, No. 2, Pp. 1–9, 2019, [Online]. Available: Https://Dx.Doi.Org/10.24853/Jurtek.11.2.117-126
M. I. P. Karmawan, F. Pulansari, And D. S. Donoriyanto, “Analisis Keseimbangan Lintasan Menggunakan Metode Largest Candidate Rule, Killbridge And Western Method, Ranked Positional Weights,” Juminten, Vol. 1, No. 1, Pp. 43–54, 2020, Doi: 10.33005/Juminten.V1i3.18.
E. Meila Sari And M. M. Darmawan, “Pengukuran Waktu Baku Dan Analisis Beban Kerja Pada Proses Filling Dan Packing Produk Lulur Mandi Di Pt. Gloria Origita Cosmetics,” J. Asiimetrik J. Ilm. Rekayasa Inov., Vol. 2, No. 1, Pp. 51–61, 2020, Doi: 10.35814/Asiimetrik.V2i1.1253.
D. L. Trenggonowati And N. Febriana, “Mengukur Efisiensi Lintasan Dan Stasiun Kerja Menggunakan Metode Line Balancing Studi Kasus Pt. Xyz,” J. Ind. Serv., Vol. 4, No. 2, Pp. 97–105, 2019, Doi: 10.36055/Jiss.V4i2.5158.
I. Dharmayanti And H. Marliansyah, “Perhitungan Efektifitas Lintasan Produksi Menggunakan Metode Line Balancing,” J. Manaj. Ind. Dan Logistik, Vol. 3, No. 1, Pp. 45–56, 2019, Doi: 10.30988/Jmil.V3i1.63.
W. P. Febriani, M. A. Saputra, And D. S. B. F. Lumbanraja, “Penerapan Konsep Line Balancing Dalam Proses,” Bull. Appl. Ind. Eng. Theory, Vol. 1, No. 2, Pp. 1–6, 2020
Downloads
Additional Files
Posted
License
Copyright (c) 2023 UMSIDA Preprints Server
This work is licensed under a Creative Commons Attribution 4.0 International License.