Implementation of Reliability Centered Maintenance (RCM) II in Packaging Industry Production Machinery Maintenance Activities
Implementasi Reliability Centered Maintenance (RCM) II pada Aktivitas Perawatan Mesin Produksi Industri Packaging
DOI:
https://doi.org/10.21070/ups.1521Keywords:
FMEA, Maintenance, Reliability Centered Maintenance IIAbstract
Along with the increasing need for productivity and the use of high technology in the form of production machines and factories, the need for maintenance functions is also increasing. At PT. Weiss Tech, a packaging machine manufacturer, has problems mainly related to wire cut machine malfunctions which cause interruptions and delays in the production process and reduce machine performance.
In overcoming these problems in this study. RCM II is one of the methods used to determine which components are due for repairs, while FMEA is defined as a method for identifying the root cause of engine failure. From the results of calculations using FMEA and RCM II, the results of the maintenance interval for the Electromotor component with a maintenance interval of 20 hours, for the Lower and upper nozzle components with a maintenance interval of 181 hours, and for the Roller component with a treatment interval of 177 hours.
Downloads
References
P. F. Ferdinant, A. Mardiana, and A. I. S. M, “Usulan Peningkatan Keandalan Mesin Pulverizer Berbasis Redundansi Standby System,” Tek. Mesin dan Ind. FT UGM, vol. 1, no. 1, pp. 36–42, 2020.
E. Nursanti, S. Avief, Sibut, and M. Kertaningtyas, Maintenance Capacity Planning. 2019.
I. B. O. Ria, E. Nursanti, and H. Galuh, “PERENCANAAN PEMELIHARAAN MESIN BOILER FEED PUMP MENGGUNAKAN METODE MARKOV CHAIN,” Valtech, vol. 4, no. 2, pp. 226–237, 2021.
A. D. Susanto and H. H. Azwir, “Perencanaan Perawatan Pada Unit Kompresor Tipe Screw,” Ilm. Tek. Ind. lebih, vol. 17, no. 1, pp. 21–35, 2018, doi: 10.23917/jiti.v17i1.5380.
A. Mutaufiq and I. Aisyyah, “PENGARUH PERENCANAAN BAHAN BAKU DAN PEMELIHARAAN MESIN TERHADAP EFEKTIFITAS PROSES PRODUKSI (SURVEI TERHADAP PERUSAHAAN MANUFAKTUR DI KAWASAN INDUSTRI JABABEKA CIKARANG) Ali,” Ekon. dan Bisnis, vol. I, no. 1, pp. 48–60, 2021.
D. P. Sari and M. F. Ridho, “EVALUASI MANAJEMEN PERAWATAN DENGAN METODE RELIABILITY CENTERED MAINTENANCE ( RCM ) II PADA MESIN BLOWING I DI PLANT I PT . PISMA PUTRA TEXTILE,” Tek. Ind., vol. 11, no. 2, pp. 73–80, 2016.
B. I. Putra, “EVALUASI MANAJEMEN PERAWATAN DENGAN METODE RELIABILITY CENTERED MAINTENANCE II ( RCM II ),” TEKNOLOJIA, vol. 5, no. 1, pp. 59–66, 2010.
R. Simbolon, D. SImbolon, and P. J. Ginting, “PERANCANGAN INTERVAL PERAWATAN MESIN SECARA PREVENTIVE MAINTENANCE RELIABILITY CENTERED MAINTENANCE II ( RCM II ) Roganda Simbolon , Doarjo Simbolon dan Paris Johannes Ginting Teknik Industri Univ,” Indones. Sos. Teknol., vol. 1, no. 3, pp. 210–221, 2020.
D. S. Dhamayanti, J. Alhilman, and N. Athari, “USULAN PREVENTIVE MAINTENANCE PADA MESIN KOMORI LS440 ( RCM II ) DAN RISK BASED MAINTENANCE ( RBM ) DI PT ABC,” Rekayasa Sist. Ind., vol. 3, no. 2, pp. 31–37, 2016.
D. Wibowo and N. Kurniati, “Penentuan Strategi Pemeliharaan Forklift Menggunakan Metode RCM II,” Tek. ITS, vol. 8, no. 2, pp. 26–31, 2019.
D. Sartika, Asngadi, and Syamsuddin, “ANALISIS PEMELIHARAAN MESIN CCO ( CRUDE COCONUT OIL ) STUDI KASUS PADA PT . SPO AGRO RESOURCES,” IlmuManajemen Univ. Tadulako, vol. 6, no. 1, pp. 10–19, 2020.
F. Vera‐García, J. A. P. Rubio, J. H. Grau, and D. A. Hernández, “Improvements of a failure database for marine diesel engines using the RCM and simulations,” Energies, vol. 13, no. 1, Dec. 2019, doi: 10.3390/en13010104.
H. Santoso, W. Sriyanto, and H. N. Sukma, “PELATIHAN PENINGKATAN SKILL TEKNISI LAB MESIN OFSET , GURU DAN SISWA DALAM MERAWAT DAN,” Politek. Negeri Media Kreat., vol. 1, no. 1, pp. 111–116, 2022.
I. Zein, D. Mulyati, and I. Saputra, “Perencanaan Perawatan Mesin Kompresor Pada PT . Es Muda Perkasa Dengan Metode Reliability Centered Maintenance ( RCM ),” Serambi Enginering, vol. 4, no. 1, pp. 383–391, 2019.
A. Damuri and D. Pernata, “Perancangan Sistem Informasi Perawatan Mold Dan Mesin Injection Molding Pada PT Hirose Electric Indonesia Menggunakan,” Ilm. MIKA AMIK Al Muslim, vol. 4, no. 1, pp. 1–9, 2020.
I. P. Raharja, I. B. Suardika, and H. G. W, “ANALISIS SISTEM PERAWATAN MESIN BUBUT MENGGUNAKAN METODE RCM (RELIABILITY CENTERED MAINTENANCE) DI CV. JAYA PERKASA TEKNIK,” Tek. Ind. ITN Malang, vol. 2019, no. September 2019, pp. 39–48, 2021.
Downloads
Additional Files
Posted
License
Copyright (c) 2023 UMSIDA Preprints Server
This work is licensed under a Creative Commons Attribution 4.0 International License.