Optimizing Furniture Industry Production Scheduling Using Nawaz Enscore and Ham Method
Optimalisasi Penjadwalan Produksi Industri Furniture Menggunakan Metode Nawaz Enscore and Ham
DOI:
https://doi.org/10.21070/ups.7110Keywords:
Optimizing, Schedulling, Delay, Nawaz Enscore and Ham, DoorAbstract
PT. XYZ is a furniture manufacturing company that produces four types of doors. Demand continues to increase, reaching 600-1000 pcs, causing delays in delivery because the drying room capacity is only 500 pcs. This research aims to analyze production scheduling using the NEH method in determining makespan values and work sequences, as well as providing efficient recommendations that enable companies to meet market demand in a timely manner and optimize production time to reduce idle time due to late deliveries The results of production scheduling using the NEH method produce a smaller makespan and faster production process time compared to the FCFS method. The NEH method produces a makespan of 5.67 with the job sequence J2-J1-J3. Meanwhile, the FCFS method produces a makespan of 6.10 with the job sequence J1-J2-J3. So the NEH method is said to be optimal because it provides an improvement in makespan time of 0.43 hours.
Downloads
References
E. Putri, “Usulan Perbaikan Penjadwalan Produksi Flow Shop dengan Menggunakan Metode Nawaz Enscore Ham,” Sci. J. Ind. Eng., vol. 1, no. 1, pp. 10–12, 2020.
A. T. Wahyudi, B. I. A. Wicaksana, and M. Andriani, “Penjadwalan Produksi Job shop Mesin Majemuk Menggunakan Algoritma Non Delay untuk Meminimalkan Makespan,” J. Rekayasa Sist. Ind., vol. 10, no. 2, pp. 183–190, 2021, doi: 10.26593/jrsi.v10i2.4666.183-190.
M. R. Fadli and W. Sulistiyowati, “Optimalisasi Penjadwalan Produksi Pipa Di Line 18 Dengan Metode First Come First Serve (Fcfs) , Earlier Due Date (Edd) , Short Process Time (Spt) (Studi Kasus : Pt Wtur),” J. Prozima, vol. 3, no. 2, pp. 44–54, 2019.
B. Dimas Anfari, “Penjadwalan Produksi Menggunakan Metode Algoritma Non Delay untuk Meminimasi Makespan,” vol. 6, no. 1, 2023, doi: 10.32734/ee.v6i1.1800.
N. Zuya and M. O. Gurusinga, “Usulan Penjadwalan Job Menggunakan Metode Campbell, Dudek and Smith (CDS) serta Metode Nawaz, Enscore and Ham (NEH) Guna Meminimalkan Makespan Proses Produksi Pistol Mainan di PT. ABC,” Talent. Publ., vol. 6, no. 1, 2023, doi: 10.32734/ee.v6i1.1904.
N. N. Azzat and M. C. Zulfa, “Optimasi penjadwalan produksi dengan algoritma heuristik pour untuk reduksi makespan pada CV CJ furniture optimization of production scheduling using pour heuristic algorithm for makespan reduction in CV CJ furniture,” Integrasi, vol. 8, no. 1, pp. 14–22, 2023, [Online]. Available: https://jurnal.um-palembang.ac.id/integrasi/article/view/5977/pdf
A. P. Mufidah and A. Pakarbudi, “Optimalisasi Waktu dan Biaya dalam Pengembangan Proyek Software Menggunakan Critical Path Method,” Semin. Nas. Sains dan Teknol. Terap., vol. 0, no. 0, pp. 1–11, 2023, [Online]. Available: https://ejurnal.itats.ac.id/sntekpan/article/view/5128
S. Rollandiaz and Y. A. Iskandar, “Evaluasi Keterlambatan Pengiriman Produk Bahan Bakar Minyak Menggunakan Lean Six Sigma,” INFOTECH J., vol. 10, no. 1, pp. 74–83, 2024, doi: 10.31949/infotech.v10i1.8796.
P. Asih, I. Mindhayani, and T. Prakasa, “Analisis penjadwalan produksi menggunakan algoritma Nawaz Esncore Ham, algortma Campell Dudek Smith, dan Nawaz Enscore Ham (Studi kasus di UMKM Arumanis Haji Ardi di Sleman),” J. Rekayasa Ind., vol. 4, no. 1, pp. 44–51, 2022.
N. Kurniawan and S. Suseno, “Optimasi Sistem Penjadwalan Produksi Dengan Metode Nawaz Enscore Ham (NEH) Pada PT Sinar Semesta,” J. Inov. dan Kreat., vol. 3, no. 1, pp. 24–33, 2023, doi: 10.30656/jika.v3i1.6001.
T. Sukmono and O. A. Nastiti, “Optimasi Penjadwalan Produksi Menggunakan Metode Total Waktu Produksi,” J. Tek. Ind., vol. 14, no. 2, pp. 155–160, 2024.
Alicia Hamad and Suseno Suseno, “Optimasi Penjadwalan Produksi Menggunakan Metode Algoritma Nawaz Enscore Ham dan Metode Harmony Search Algorithm Untuk Meminimasi Makespan,” J. Penelit. Rumpun Ilmu Tek., vol. 2, no. 3, pp. 218–226, 2023, doi: 10.55606/juprit.v2i3.2210.
D. S. Manik and A. R. Habibi, “Minimalisasi Makespan Pada Perusahaan Tamiya Menggunakan Algoritma Nawaz, Enscore, and Ham (NEH),” Talent. Conf. Ser. Energy Eng. , vol. 6, no. 1, 2023, doi: 10.32734/ee.v6i1.1903.
F. Darmawan, “Usulan Perbaikan Penjadwalan Produksi Inner Liner Pada Kulkas dengan Menggunakan Metode Nawaz Enscore Ham di PT.XYZ,” vol. 3, no. 2, pp. 30–33, 2022.
D. Arifandi, T. Lasalewo, and H. Hasanuddin, “Analisis Metode NEH Untuk Meminimalkan Makespan Pada Penjadwalan Produksi di Rumah Industri Wahyu,” Jambura Ind. Rev., vol. 2, no. 2, pp. 65–74, 2022, doi: 10.37905/jirev.v2i2.15861.
M. A. Irfansah, F. Hardiyanti, and R. Indrawan, “Optimasi Penjadwalan Produksi Menggunakan Metode Campbell Dudek Smith (CDS) Dan Metode Nawaz Enscore Ham (NEH) di PT. RPC Indonesia,” pp. 1–6, 2023.
R. D. Apnena, “Optimasi Penjadwalan Flow Shop Perusahaan Garment dengan Metode Campbell Dudek Smith (CDS), Algoritma Nawaz Enscore Ham (NEH), dan Algoritma Pour dengan Kriteria MInimasi Makespan,” J. Informatics Electron. Eng., vol. 01, no. 01, pp. 32–35, 2021, doi: 10.36275/stsp.v18i2.118.
Y. Muharni, K. Kulsum, and D. A. Utami, “Usulan Penjadwalan Produksi Pipa Erw Menggunakan Metode Nawaz Enscore Ham Dan Genetic Algorithm,” FLYWHEEL J. Tek. Mesin Untirta, vol. 1, no. 1, p. 29, 2019, doi: 10.36055/fwl.v1i1.6385.
R. F. Arief, Joycelin, Jesslyn, Alex, and A. J. Reynaldi, “Analisis Manajemen Proyek pada Ide Bisnis Love Earth Plan (LEP),” J. Mirai Manag., vol. 8, no. 1, pp. 326–347, 2023.
A. Darmawan, R. Ananda, and S. Luthfianto, “Optimalisasi Produksi Keripik Jamur dengan Metode Nawaz Enscore Ham (NEH), Long Processing Time (LPT) Dan Shortest Processing Time (SPT),” J. Ilm. Ilmu dan Teknol. Rekayasa |, vol. 4, no. September, pp. 1–13, 2021, doi: 10.31962/jiitr.vvii.64.
Downloads
Additional Files
Posted
License
Copyright (c) 2025 UMSIDA Preprints Server

This work is licensed under a Creative Commons Attribution 4.0 International License.