Proposal Improvement of the Upper Part Changeover Process at PT. XYZ Uses Single Minute Exchange of Die (SMED)


Usulan Perbaikan Proses Changeover Bagian Upper di PT. XYZ Menggunakan Single Minute Exchange of Die (SMED)

##article.authors##

DOI:

https://doi.org/10.21070/ups.5747

Keywords:

Single Minutes Exchanges of Dies, Internal, External Set up, Set up Time, Fishbone Diagram

Abstract

PT XYZ is a manufacturing company engaged in the production shoes. the company prioritizes quality production. The problem with the company was the high time set up changeover. A change of engine is required to work on shoe products in this . This current set up changeover caused the production process to be interrupted and timed out. The number of set up changeover times reaches 119.16 minutes. This study aims to find out the factors that cause the changeover set up process and improve with the Single Minutes Exchange of Dies (SMED) method. Fishbone diagrams produce that long cause set up changeover due to method, human, machine, and environmental factors. With the implementation of the SMED method, 25 internal activities were converted into 12 internal activities. This change resulted in an engine setup time of 119.16 minutes to 55.46 minutes and a 46.5% reduction in engine set up time.

 

Downloads

Download data is not yet available.

References

A. Silva, J. C. Sá, G. Santos, F. J. G. Silva, L. P. Ferreira, and M. T. Pereira, “Implementation of SMED in a cutting line,” Procedia Manuf., vol. 51, no. 2020, pp. 1355–1362, 2020, doi: 10.1016/j.promfg.2020.10.189.

K. Lintas, I. Bidang, R. Arsitektur, B. Sektor, and I. Manufaktur, “Jurnal KaLIBRASI Literature Review : Penerapan Metode Single Minutes Exchange of Die,” vol. 6, no. 2, pp. 59–69, 2023.

D. Guzel and A. S. Asiabi, “Improvement setup time by using SMED and 5S (An application in SME),” Int. J. Sci. Technol. Res., vol. 9, no. 1, pp. 3727–3732, 2020.

D. P. Hendarto, F. N. Azizah, and W. Wahyudin, “Minimasi Setup Time Mesin Jahit Pada CV Karjum Jaya Mandiri Dengan Metode SMED,” J. Serambi Eng., vol. 8, no. 2, pp. 5182–5190, 2023, doi: 10.32672/jse.v8i2.5722.

D. I. Pt and D. Intiterang, “Usulan Pengurangan Setup Time Untuk Pergantian Dies Pressing Blanking Dan Bending Pada Lini Produksi Plate Center Kvba Dengan Metode Smed,” vol. 11, 2015.

L. Chandra Setiawan, “Mereduksi Waktu Set Up Menggunakan Metode SMED Pada Mesin ISS Kemas PT PHAPROS TBK Semarang,” Ind. Eng. Online J., vol. 12, no. 1, 2023.

R. Saputra, H. Arianto, and L. Irianti, “USULAN MEMINIMASI WAKTU SET-UP DENGAN MENGUNAKAN METODE SINGLE MINUTE EXCHANGE DIE ( SMED ) DI PERUSAHAAN X,” vol. 4, no. 02, pp. 206–218, 2016.

B. Suhardi and D. Satwikaningrum, “Perbaikan Waktu Set Up Dengan Menggunakan Metode Smed,” Semin. Nas. IENACO, pp. 474-483Suhardi, B., Satwikaningrum, D. (2015). P, 2015.

D. P. Dewa and N. Sutapa, “Upaya Pengurangan Waktu Proses Changeover Pada Mesin Fisher Pada Perusahaan Kemasan Kosmetik,” vol. 9, no. 2, pp. 335–342, 2021.

Posted

2024-08-15