Preprint has been published in a journal as an article
Preprint / Version 1

Analysis Time Study and Takt Time in the Product Loading Process


Analisis Time Study dan Takt Time dalam Proses Memuat Barang

##article.authors##

DOI:

https://doi.org/10.21070/ups.4872

Keywords:

Material Handling, Time Study, Takt Time

Abstract

A warehouse is a place to store goods in a neat and orderly manner, so that the capacity of the room can be used optimally. The process of moving in a good way can reduce material handling costs. There is a difference in roll loading process time between morning, afternoon and night shifts. From this problem, it has an impact on the decrease in shipping capacity by 74.7%. The purpose of this study is to determine the standard delivery process time and also determine the speed of workers. The time study method is a way to find out the time required by workers. Then compared with the takt time method which is a method of determining production capacity through the production system in a certain time.

Downloads

Download data is not yet available.

References

C. D. Anggraini., N. R. Istiari,. G. Satrio, “Implementasi Prosedur Kegiatan Lapangan Penumpukan dan Gudangn Lini I General Cargo di Terminal Mirah Pt. Pelindo III Regional Jawa Timur”, vol. 4, no 1, 2022, pp. 35-36.

Somadi., B. S. Priambodo., P. R. Okraini, “Evaluasi Kerusakan Barang Dalam Proses Pengiriman Dengan Menggunakan Metode Seven Tools”, vol. 6, no. 1, June 2020, pp. 1-2. [Online]. Availabel: http://dx.doi.org/10.30656/intech.v6i1.2008

A. N. Cahyawati, and N. D. Prastuti, “Analisis Pengukuran Waktu Pada Proses Packing Kasa Hidrofil Menggunakan Metode Stopwatch Time Study”, February 2018, pp. 1-2.

A. Y. Pradana, and F. Pulansari, “Analisis Pengukuran Waktu Kerja Dengan Stopwatch Time Study Untuk Meningkatkan Target Produksi di Pt. XYZ”, vol. 2, no. 1, 2021, pp. 13-14. [Online]. Availabel: http://juminten.upnjatim.ac.id/index.php/juminten

T. U. Hasanah., T. Wulansari., T. Putra., M. Fauzi, “Penerapan Lean Manufacturing Dengan Metode Takt Time dan FMEA Untuk Mengidentifikasi Waste Pada Proses Produksi Steril di Industri Farmasi”, vol. 7, no. 2, 2020, pp. 88-89. [Online]. Availabel: http://jrsi.sie.telkomuniversity.ac.id

O. B. Saputri., N. Huda., M. Hannase, “Analisis Rencana Elektronifikasi Keuangan Daerah Dalam Memperluas Kontribusi Zakat Degan Pendektakan Fishbone Diagram Analysis”, vol. 10, no. 1, March 2022, pp. 5-6.

M. Rahayu, and S. Juhara, “Pengukuran Waktu Baku Perakitan Pena Dengan Menggunakan Waktu Jam Henti Saat Praktikum Analisa Perancangan Kerja”, Jurnal Pendidikan dan Aplikasi Industri, vol. 7, no. 2, Agust 2020, pp. 93-94.

N. Yudisha, “Perhitungan Waktu Baku Menggunakan Metode Jam Henti Pada Proses Bottling”, vol. 2, no. 2, October 2021, pp. 85-87. [Online]. Availabel: http://jurnal.alazhar-university.ac.id/index.php/vorteks

S. B. Prayuda, “Analisis Lingkungan Kerja Dalam Menentukan Waktu Baku Untuk Meningkatkan Produktivitas Kerja Pada Produksi Kerudung Menggunakan Metode Time Study Pada UKM Lisna Collection di Tasikmalaya”, Jurnal Mahasiswa Industri Galuh, vol. 1. no. 1, 2020, pp. 120-122.

Heldayani, and F. Yuamita, “Perbaikan Work Station dan Pengukuran Waktu Kerja Dalam Menentukan Waktu Standar Guna Meningkatkan Produktivitas Pada Lini Kerja Spot Assembly”, Universitas Teknologi Yogyakarta, vol. 1, no. 9, Agustus 2022, pp. 2945-2946.

B. Arianto, “Buku Petunjuk Praktikum Analisis Perancangan Kerja”, Universitas Dirgantara Marsekal Suryadarma, March 2024, pp. 3-4.

J. Saputra., E. Hafrida., M. Musri, “Pengukuran Waktu Kerja Berbasis Stopwatch Time Study dan Analisis Keselamatan Kesehatan Kerja Pada Pabrik Tahu Sukri Bukti Batrem Dumai”, Jurnal Aplikasi Rancangan Teknik Industri, 2020. pp. 88-90.

R. N, Hidaya., L. M. Sabri., M. Awaluddin, “Analisis Desain Jaring GNSS Berdasarkan Fungsi Presisi”, Jurnal Geodesi Undip, vol. 8, no. 1, January 2019, pp. 50-51.

E. M. Sari, and M. M. Darmawan, “Pengukuran Waktu Baku dan Analisis Beban Kerja Pada Proses Filling dan Packing Produk Lulur Mandi di Pt. Gloria Orgita Cosmetic”, vol. 2, no. 1, January 2020, pp. 52-54. [Online]. Availabel: http://journal.univpancasila.ac.id/index.php/asiimetrik/

P. V. Aysyiawan and H. F. Satoto, “Analisis Pengukuran Waktu Kerja dan Beban Kerja Mental Guna Menentukan Tenaga Kerja Yang Optimal Pada Cv. XYZ”, vol. 1, September 2022, pp. 185-186.

B. I. Putra and R. B. Jakaria, “Buku Ajar Analisa dan Perancangan Sistem Kerja”, Universitas Muhammadiyah Sidoarjo, 2020.

A. Y. Haryudiniarti, and W. Putri, “Work Analysis of Wire Handling Process Using Work Sampling Method and Standard Time Determination”, vol. 1, no. 1, June 2022, pp. 18-19. [Online]. Availabel: https://journal.jgu.ac.id/index.php/j-gers

A. S. Ramadhani, “Pengukuran Waktu Baku dan Analisis Beban Kerja Untuk Menentukan Jumlah Optimal Tenaga Kerja Pada Proses Cetak Produk Lipstick”, vol. 12, no. 2, 2020, pp. 180-181.

H. Damayanthi, and S. Hidayat, “Pengukuran Waktu Baku Stasiun Kerja Pada Pipa Jenis Sio Menggunakan Metode Jam Henti di Pt. XYZ”, November 2020.

N. Yuselin, and I. G. A. Angganatha, “Meningkatkan Efisiensi Line Painting Propeller Shaft Kategori 2 dan 3 Dengan Metode Line Balancing di Pt Inti Ganda Perdana”, Technologic, vol. 10, no. 2, Desember 2019, pp. 1-2.

R. A. Imram., D. F. Panjaitan., N. S. Uletika, “Lean Approach of Pharmaceutical Installations At Hospital ABC Purbalingga to Increase Pharmacy Service Efficiency”, Journal of Industrial Engineering and Halal Industries, vol. 2, no. 1, June 2022, pp. 14-15.

Z. Sinaga, “Perencanaan Waktu Kerja Pada Produksi Water Pressure Tank Guna Meningkatkan Produktivitas Dengan Metode Time Study”, vol. 11, no. 1, February 2023, pp. 41-43. [Online]. Availabel: http://ejournal.unismabekasi.ac.id

T. Hidayat, and A. Saefulloh, “Perawatan Carryroller belt Conveyor C101 Pada Mesin Incinerator Dengan Metode Fishbone Diagram di Pt Fajar Surya Wiesa, Tbk”, Jurnal Teknik Industri, vol. 3, no. 1, 2022, pp. 49-50.

Posted

2024-06-12