Preprint has been published in a journal as an article
Preprint / Version 1

Integration of Vsm and Valsat Methods in Lean Manufacturing Principles to Minimize Production Waste at PT. Spln


Integrasi Metode Vsm dan Valsat dalam Prinsip Lean Manufacturing untuk Meminimalkan Waste Production pada PT. Spln

##article.authors##

DOI:

https://doi.org/10.21070/ups.4815

Keywords:

Value Stream Mapping, Value Stream Analysis Tools, Lean Manufacturing

Abstract

Increasing productivity and product quality is very important for the success of a company. One effective approach is Lean Manufacturing, which focuses on optimizing human resources and production equipment by reducing waste. This research aims to maximize productivity and product quality by reducing waste in the production process of PT. SPLN uses Value Stream Mapping (VSM) and Value Stream Analysis Tools (VALSAT). VSM is used to evaluate the condition of each workstation, while PAM from VALSAT is used to reduce waste. After improvements were made, there was a significant increase in cable tray production from 138 units to 172 units. This study identified that Necessary but Not Value Added (NNVA) activities reached 70.54%, followed by Non Value Added (NVA) at 29.04%, and Value Added (VA) at 0.03% in PT's production process. SPLN. Recommendations for improvement include reducing NNVA and NVA activities to improve operational efficiency

Downloads

Download data is not yet available.

References

A. Ravizar and R. Rosihin, “Penerapan Lean Manufacturing untuk Mengurangi Waste pada Produksi Absorbent,” J. INTECH Tek. Ind. Univ. Serang Raya, vol. 4, no. 1, p. 23, 2018, doi: 10.30656/intech.v4i1.854.

A. Febrian, “Penerapan Lean Manufacturing dengan Metode Value Stream Mapping untuk Mengurangi Waste,” J. Ind. Syst. Eng., vol. 4, no. 1, pp. 1–3, 2023.

I. Komariah, “Penerapan Lean Manufacturing Untuk Mengidentifikasi Pemborosan (Waste) Pada Produksi Wajan Menggunakan Value Stream Mapping (Vsm) Pada Perusahaan Primajaya Alumunium Industri Di Ciamis,” J. Media Teknol., vol. 8, no. 2, pp. 109–118, 2022, doi: 10.25157/jmt.v8i2.2668.

I. A. Sari Wulandari, N. R. Hanum, and F. T. Sisiliani, “Identification of the Quality of Ready-to-Eat Food Production Waste Water Using the MCDM Approach,” Acad. Open, vol. 8, no. 1, pp. 1–15, 2023, doi: 10.21070/acopen.8.2023.6956.

P. Produksi, D. Kemasan, M. L. Di, P. T. Xyz, M. A. Mu, and S. N. Nurbani, “Valsat Untuk Mengurangi Waste Proses Produksi Teh,” vol. 4, no. 1, pp. 24–35.

L. Kartika and S. Dony, “Penerapan Lean Manufacturing untuk mengidentifikasi waste pada proses produksi kain knitting di lantai produksi PT. XYZ,” Pros. Ind. Res. Work. Natl. Semin., vol. 10, no. 1, pp. 567–575, 2019, [Online]. Available: https://jurnal.polban.ac.id/ojs-3.1.2/proceeding/article/view/1519

T. Satria, “Perancangan Lean Manufacturing dengan Menggunakan Waste Assessment Model (WAM) dan VALSAT untuk Meminimumkan Waste (Studi Kasus: PT. XYZ),” J. Rekayasa Sist. Ind., vol. 7, no. 1, p. 55, 2018, doi: 10.26593/jrsi.v7i1.2828.55-63.

M. S. A. Khannan and H. Haryono, “Analisis Penerapan Lean Manufacturing untuk Menghilangkan Pemborosan di Lini Produksi PT Adi Satria Abadi,” J. Rekayasa Sist. Ind., vol. 4, no. 1, p. 47, 2017, doi: 10.26593/jrsi.v4i1.1383.47-54.

N. Graciella, B. Boediono, and N. Sutapa, “Eliminasi Non-Value Added Activity…,” J. Titra, vol. 8, no. 2, pp. 425–432, 2020.

A. R. Irwan Setiawan, “Penerapan Lean Manufacturing Untuk Meminimalkan Waste Dengan Menggunakan Metode VSM Dan WAM Pada PT XYZ,” Semin. Nas. Penelit. LPPM UMJ, pp. 1–10, 2021.

A. O. Benedikta and I. Sukarno, “Evaluasi Proses Pengadaan Barang Menggunakan Metode Value Stream Mapping pada Perusahaan Minyak dan Gas,” J. Logistik Indones., vol. 4, no. 1, pp. 20–31, 2020, doi: 10.31334/logistik.v4i1.870.

A. Ahmad, A. Petta, P. Wipajung, and T. Priyasmanu, “MEMINIMASI WASTE MENGGUNAKAN METODE VALUE STREAM MAPPING DAN FAILURE MODE AND EFFECT ANALYSIS PADA LINI PRODUKSI USAHA SHUTTLECOCK PROSPEK,” vol. 6, no. 2, pp. 212–219, 2023.

A. M. Zulfikar and T. Rachman, “Penerapan Value Stream Mapping Dan Process Activity Mapping Untuk Identifikasi Dan Minimasi 7 Waste Pada Proses Produksi Sepatu X Di Pt . Pai,” J. Inovisi, vol. 16, pp. 13–24, 2020.

H. Rusmawan, “Perancangan Lean Manufacturing Dengan Metode Value Stream Mapping (VSM) Di PT Tjokro Bersaudara (PRIOK),” J. Optimasi Tek. Ind., vol. 2, no. 1, p. 30, 2020, doi: 10.30998/joti.v2i1.4128.

D. Rosarina, S. Lestari, and J. C. Dinata, “Eliminasi Waste Pada Proses Produksi Malt Powder Dengan Metode VSM dan VALSAT (Studi Kasus PT. XYZ),” J. Tek., vol. 11, no. 1, pp. 43–52, 2022, doi: 10.31000/jt.v11i1.5593.

Posted

2024-07-05