Overall Equipment Effectiveness (OEE), Downtime, Analytic Hierarchy Process (AHP), Expert Choice

Abstract

PT XYZ is a company engaged in construction and one of the machines used in carrying out production activities is a batching plant machine. In a period of 6 months, the batching plant machine suffered sudden engine damage 39 times on Line 5. The purpose of this study is to measure the effectiveness of the machine using the OEE (Overall Equipment Effectiveness) method and identify problem factors using fishbone diagrams and can determine alternative proposals for improvement in accordance with the highest weighting using the Analytical Hierarchy Process (AHP) approach assisted using expert choice software 11. The results showed an average value of OEE of 91.34% and a high value of downtime is defined as a loss that affects the low value of availability. An alternative strategy that is a top priority in minimizing downtime is the development of a Standard Operating Procedure (SOP) worth 39.8%.

Downloads

Download data is not yet available.

References

B. Aprina, “Analisa Overall Resource Effectiveness Untuk Meningkatkan Daya Saing Dan Operational Excellence,” JITMI (Jurnal Ilm. Tek. dan Manaj. Ind., vol. 2, no. 1, p. 1, 2019, doi: 10.32493/jitmi.v2i1.y2019.p1-10.

L. E. Puspita and E. P. Widjajati, “Pengukuran Efektivitas Mesin Latexing Pada Produksi Karpet Permadani Dengan Menggunakan Metode Overall Equipment Effectiveness (Oee) Dan Overall Resource Effectiveness (Ore) Di Pt. Xyz,” Juminten, vol. 2, no. 4, pp. 1–12, 2021, doi: 10.33005/juminten.v2i4.295.

S. Abdillah and F. Najmudin, “Proses pembuatan beton dengan mutu k-350 pada mesin batching plant wet mix di PT Prima Peton Nusantara,” J. Ilm. Wahana Pendidik., vol. 8, no. 19, pp. 570–580, 2022.

Gustina, M. Y. Tuloli, and A. Alitu, “Optimalisai Pelaksanaan Pengecoran Antara Beton Site Mix dan Ready Mix Dari Batching Plnat Pada Pekerjaan Pengendalian Banjir Sungai Bolango Kota Gorontalo,” vol. 2, no. 2, pp. 40–44, 2022, doi: 10.37905/cj.v2i2.53.

V. I. Lestari and J. A. Suryadi, “Analisis Efektivitas Mesin Pada Stasiun Ketel Dengan Menggunakan Metode Overall Equipment Effectiveness (Oee) Di Pt. Xyz,” Tekmapro J. Ind. Eng. Manag., vol. 16, no. 2, pp. 36–47, 2021, doi: 10.33005/tekmapro.v16i2.240.

D. O. Shafitri, A. Larasati, and A. M. Hajji, “Peningkatan Nilai Overall Equipment Effectiveness Mesin Stone Crusher Dengan Menggunakan Pendekatan Total Productive Maintenance (Studi Kasus Pt. Brantas Abipraya),” Ind. Inov. J. Tek. Ind., vol. 12, no. 2, pp. 73–87, 2022, doi: 10.36040/industri.v12i2.4007.

H. C. Wahyuni and Wasito, “Pengaruh Kualitas Pelayanan Terhadap Keputusan Pengambilan Pembiayaan Pada BPD Kal-bar Syariah Cabang Sintang,” JBMP (Jurnal Bisnis, Manaj. dan Perbankan), vol. 6, no. 2, pp. 0–8, 2021, doi: 10.21070/jbmp.v6i2.356.

Y. Wijaya, L. Permata, S. Hartanti, and J. Mulyono, “Pengukuran Kinerja Mesin Cetak Menggunakan Metode Overall Equipment Effectiveness Untuk Mengurangi Six Big Losses,” J. Tekno Insentif, vol. 16, no. 1, pp. 38–53, 2022.

M. Ridloi and R. B. Jakaria, “Totaliproductive Maintenance (Tpm) Analysis Using the Overall Equipment Effectiveness (Oee) Method and Six Big Losses on an Injection Molding Machine,” Procedia Eng. Life Sci., vol. 1, no. 2, pp. 1–9, 2021, doi: 10.21070/pels.v1i2.938.

J. Guritno and A. Sidhi Cahyana, “Implementation of Autonomous Maintenance in Total Productive Maintenance,” Procedia Eng. Life Sci., vol. 1, no. 2, pp. 1–8, 2021, doi: 10.21070/pels.v1i2.914.

W. Sukmoro, Oee Demistifikasi, Ke-1. Bekasi: PT Mitra Prima Produktivitas, 2023.

J. Gianfranco, M. I. Taufik, F. Hariadi, and M. Fauzi, “Pengukuran Total Productive Maintenance (Tpm) Menggunakan Metode Overall Equipment Effectiveness (Oee) Pada Mesin Reaktor Produksi,” J. Lebesgue J. Ilm. Pendidik. Mat. Mat. dan Stat., vol. 3, no. 1, pp. 160–172, 2022, doi: 10.46306/lb.v3i1.109.

H. Ariyah, “Penerapan Metode Overall Equipment Effectiveness ( OEE ) Dalam Peningkatan Efisiensi Mesin Batching Plant ( Studi Kasus : PT . Lutvindo Wijaya Perkasa ),” J. Teknol. Dan Manaj. Ind. Terap., vol. 1, no. 2, pp. 70–77, 2022.

I. D. Pranowo, Sistem dan Manajemen Pemeliharaan (Maintenance: System and Management), Ke-1. Yogyakarta: CV Budi Utama, 2019.

A. Chandra, Mujaddid, Hanafi, R. Nugroho, and N. D. Romadona, Pedoman Overall Equipment Effectiveness Peralatan Kesehatan, Ke-1. Jakarta: Kementrian Kesehatan RI, 2021.

Y. A. Sujarwo and A. Ratnasari, “Aplikasi Reservasi Parkir Inap Menggunakan Metode Fishbone Diagram dan QR-Code,” J. SISFOKOM, vol. 09, no. 3, pp. 302–309, 2020.

I. D. Febryanto and R. Berlianto, “Application of the Analytical Hierarchy Process ( AHP ) Method in Selecting Warehouse Locations for Onlineshop Goods Storage ( Case Study : Expedited Shipment of Finished Goods ) Pengaplikasian Metode Analytical Hierarchy Process ( AHP ) Dalam Pemilihan L,” PROZIMA (Productivity, Optim. Manuf. Syst. Eng., vol. 6, no. 2, pp. 120–129, 2022.

I. A. S. Wulandari, H. C. Wahyuni, I. Mardiyah, and N. R. Hanun, “Environment Performance Index Assessment on Food Production: A Case Study in Indonesia,” J. Tek. Ind., vol. 23, no. 2, pp. 93–104, 2022, doi: 10.22219/jtiumm.vol23.no2.93-104.

Y. Handrianto and E. W. Styani, “Penerapan Metode Analytical Hierarchy Process ( AHP ) Untuk Pemilihan Metode Pembelajaran,” J. Sist. Inf., vol. 12, no. 1, pp. 1932–1942, 2020.

A. Supriadi, A. Rustandi, D. H. Komarlina, and G. T. Ardiani, Analytical Hierarchy Process (AHP) (Teknik Penentuan Strategi Daya Saing Kerajinan Bordir), Ke-1. Yogyakarta: CV Budi Utama, 2018.

M. Sundari, A. Asnawati, and I. Kanedi, “Sistem Pendukung Keputusan Penilaian Dosen Terbaik Menggunakan Metode Analytical Hierarchy Process ( AHP ) Studi Kasus Fakultas Keguruan dan Ilmu Pendidikan Universitas Dehasen Bengkulu Indra Kanedi di FKIP Universitas Dehasen Bengkulu menggunakan metode,” JURITEK, vol. 4, no. 1, pp. 28–43, 2024.

S. Pant, A. Kumar, M. Ram, Y. Klochkov, and H. K. Sharma, “Consistency Indices in Analytic Hierarchy Process: A Review,” Mathematics, vol. 10, no. 8, pp. 1–15, 2022, doi: 10.3390/math10081206.

J. E. Leal, “MethodsX AHP-express : A simpli fi ed version of the analytical hierarchy process method,” MethodsX, vol. 7, pp. 1–11, 2020, doi: 10.1016/j.mex.2019.11.021.

A. Supriadi, A. Rustandi, D. H. Komarlina, and G. T. Ardiani, Analytical Hierarchy Process ( AHP ), Ke-1. Yogyakarta: CV Budi Utama, 2018.

Hidayanti, A. H. Maksum, and M. T. Rachmat, “Analisis Efektivitas Mesin Shearing menggunakan Metode Overall Equipment Effectiveness pada PT . Anugrah Damai Mandiri,” J. Serambi Eng., vol. 8, no. 2, pp. 5577–5585, 2023.

Posted

2024-04-27