Relayout of Production Facilities and Warehousing in Margarine Production with Systematic Layout Planning and Blocplan Methods
Relayout Fasilitas Produksi dan Pergudangan pada Produksi Margarin dengan Metode Systematic Layout Planning dan Blocplan
DOI:
https://doi.org/10.21070/ups.4054Keywords:
Re-layout Facility, Blocplan, Systematic Layout PlanningAbstract
PT Landkrone Indo Nutri is a company engaged in the production of oils and fats, the final product of which is margarine. The current layout of production and warehousing facilities at PT Landkrone Indo Nutri is inefficient, it can be seen that production efficiency has decreased from 94% to 88% every year. Production inefficiencies are thought to be due to production layouts that do not take into account the degree of closeness. By integrating the Systematic Layout Planning (SLP) and Blocplan methods. SLP calculates department proximity factors in detail, while for Blocplan the method provides the most efficient proposed layout. The results of this research were obtained from the results of the SLP method calculations that the total reduction in movement distance was greater, namely 52.5 m, with an increase in efficiency of 59.8%. This value is expected to help improve the production process flow in the initial layout.
Downloads
References
N. Kalim and Lukmandono, “Minimizing Material Handling Costs with the SLP Method and Material Transport Equipment in Steel Pipe Companies,” PROZIMA (Productivity, Optim. Manuf. Syst. Eng., vol. 4, no. 2, pp. 10–16, 2021, doi: 10.21070/prozima.v4i2.1310.
R. E. Hidayat and B. I. Putra, “Re-Layout Layout of Material Warehouse Using Dedicated Storage Method at PT. A B C,” PROZIMA (Productivity, Optim. Manuf. Syst. Eng., vol. 3, no. 2, pp. 55–61, 2021, doi: 10.21070/prozima.v3i2.1270.
M. Zainul, “Buku manajemen strategik.” 2009.
S. S. Moch and A. S. Cahyana, “Relayout Gudang Barang Jadi Untuk Memaksimal Kapasitas Produk Jadi Dengan Menggunakan Metod Activity Relation Chart dan Share Storage,” Spektrum Ind., vol. 15, pp. 185–197, 2015.
Tompkins, Tompkins, James A - Facilities planning-Wiley (2010).
N. T. Yulia and A. S. Cahyana, “Facility Relayout Using Systematic Layout Planning and Blocplan Methods to Minimize Material Handling Distance,” Procedia Eng. Life Sci., vol. 2, no. 2, 2022, doi: 10.21070/pels.v2i2.1231.
S. Wignjosoebroto, Tata Letak Pabrik dan Pemindahan Bahan, Keempat. 2009.
C. Casban and N. Nelfiyanti, “Analisis Tata Letak Fasilitas Produksi Dengan Metode Ftc Dan Arc Untuk Mengurangi Biaya Material Handling,” J. PASTI, vol. 13, no. 3, p. 262, 2020, doi: 10.22441/pasti.2019.v13i3.004.
F. R. Suseno, “Analisis Perancangan Ulang Tata Letak Fasilitas Produksi Dengan Menggunakan Metode Systematic Lay Out Planning (Slp) Di PT Adi Satria Abadi,” vol. 20, no. 1, pp. 105–123, 2022.
J. Laurent, L. Gozali, R. Farrel, and C. O. Doaly, “Production Layout Replanning Using Systematical Layout Planning with Shared Storage Method Analysis and Flexsim Simulation in Garment and Textile Company,” pp. 2159–2171, 2023, doi: 10.46254/an12.20220377.
E. B. Prasetyo and A. S. Cahyana, “Re-layout at the SME Crackers Production Section,” Procedia Eng. Life Sci., vol. 1, no. 2, 2021.
A. Rozak, A. D. Kristanto, G. S. Raharjo, and N. A. Saleh, “Penerapan ARC dan ARD untuk Membuat Rancangan Layout Fasilitas pada Pabrik Kerupuk Menggunakan BLOCPLAN di CV Arto Moro,” Bull. Appl. Ind. Eng. Theory, vol. 2, no. 2, pp. 145–149, 2021.
B. Nusantara, W. Andalia, and I. Pratiwi, “Usulan Perbaikan Tata Letak Fasilitas Pabrik Peralatan Lalu Lintas Dengan Metode Arc Dan Ard,” Nusant. Eng., vol. 6, no. 1, pp. 37–45, 2023, doi: 10.29407/noe.v6i1.19862.
N. Fithri Azizah, R. Agil Apriani, F. P. Mahardika, M. A. Zikra Zizo, F. Aji Pradana, and A. Azzam, “Analisis Perancangan Tata Letak Menggunakan Metode Activity Relationship Chart (ARC) dan Computerized Relationship Layout Planning (CORELAP) Pada CV. Tunas Karya,” J. Tek. Ind., vol. 9, no. 1, p. 2023, 2023.
M. A. Daya, F. D. Sitania, and A. Profita, “Perancangan Ulang (re-layout) tata letak fasilitas produksi dengan metode blocplan (studi kasus: ukm roti rizki, Bontang),” PERFORMA Media Ilm. Tek. Ind., vol. 17, no. 2, pp. 140–145, 2019, doi: 10.20961/performa.17.2.29664.
L. N. Sholeha et al., “Perancangan Tata Letak Fasilitas Menggunakan Metode Blocplan ‘Studi Kasus Toko Oleh-Oleh Surabaya Honest,’” J. Ilm. Tek. dan Manaj. Ind. J. Taguchi, vol. 2, no. 2, pp. 2022–249, 2022.
K. Idris, “Perancangan Ulang Tata Letak Fasilitas Produksi dengan Meminimasi Waktu dan Biaya Material Handling,” Ind. Eng., vol. 15, no. 2, 2020.
M. M. Abdurrahman, R. Kastaman, and T. Pudjianto, “Rancang Ulang Tata Letak Fasilitas Produksi untuk Efisiensi Produksi Kopi di PT Sinar Mayang Lestari Menggunakan Metode Systematic Layout Planning dan Software Blocplan,” Agrikultura, vol. 32, no. 2, p. 146, 2021, doi: 10.24198/agrikultura.v32i2.33610.
D. P. Sari and B. Cahyadi, “Relayout Fasilitas Produksi pada Produk Pipe Assy,” J. Ilm. Fak. Tek. Univ. Muhammadiyah Jakarta, vol. 1, no. November 2021, pp. 1–9, 2021.
T. A. Husen, P. P. Suryadhini, and M. D. Astuti, “Perancangan Tata Letak Fasilitas untuk Meminimasi Jarak Material Handling pada UKM XYZ Menggunakan Metode ALDEP,” Pros. IDEC 2020, no. November, p. A08.1-A08.12, 2020.
Downloads
Additional Files
Posted
License
Copyright (c) 2024 UMSIDA Preprints Server
This work is licensed under a Creative Commons Attribution 4.0 International License.