Analysis of Spare Part Inventory Control Using Economic Order Quantity (EOQ) and Continuous Review Methods
Analisis Pengendalian Persediaan Spare Part Menggunakan Metode Economic Order Quantity (EOQ) dan Continuous Review
DOI:
https://doi.org/10.21070/ups.3639Keywords:
Inventory Control, Economic Order Quantity, Continuous ReviewAbstract
Manufacturing companies that produce concrete, rely on machines for their production activities. Those machines requires spare parts for maintenance. The company's spare part inventory fluctuates in demand for spare parts and requires uncertain inventory. This results makes inventory in storage warehouses often experiencing overstock or stockout. Thus causing an increase in inventory costs in the company which has an impact on the cash flow in the company. This study aims to obtain efficient total inventory costs as well as optimal order and reorder point quantities. The methods used are the Economic Order Quantity (EOQ) method and continuous review. The results of this study obtained an order quantity of 131 units and a reorder point of 18 units so that the total inventory costs obtained are more efficient than the total inventory costs so far with a difference of IDR 293.152.400 and a savings percentage of 11%
Downloads
References
A. O. B. Ginting, “Penerapan Data Mining Korelasi Penjualan Spare Part Mobil Menggunakan Metode Algoritma Apriori ( Studi Kasus : CV . Citra Kencana Mobil ),” J. Inf. Technol. UNIMOR, vol. 1, no. 2, pp. 70–77, 2021, doi: https://doi.org/10.32938/jitu.v1i2.1472.
A. Y. Siahaan, L. Andrawina, and F. Yulianti, “Perancangan Kebijakan Persediaan Untuk Meminimasi Biaya Persediaan Suku Cadang Dengan Menggunakan Metode Continuous Review dan Periodic Review di PT FGH,” e-Proceeding Eng., vol. 8, no. 5, pp. 7572–7579, 2021.
A. W. Pratiwi, I. Maflahah, and Asfan, “Controlling Vaname Shrimp (Litopenaeus Vannamei) Raw Material Inventories (Case Study at PT. Grahamakmur Ciptapratama Sidoarjo),” PROZIMA (Productivity, Optim. Manuf. Syst. Eng., vol. 4, no. 1, pp. 37–46, 2020, doi: 10.21070/prozima.v4i1.1273.
E. R. E. Wiriyani, “Analisis pengendalian persedian bahan baku crumb rubber dengan metode EOQ (economic order quantity) pada PT. golden energi mandiangin,” J. Inov., vol. 3, no. 1, pp. 31–36, 2020.
W. Emar, Z. A. Al-Omari, and S. Alharbi, “Analysis of inventory management of slow-moving spare parts by using ABC techniques and EOQ model-a case study,” Indones. J. Electr. Eng. Comput. Sci., vol. 23, no. 2, pp. 1159–1169, Aug. 2021, doi: 10.11591/ijeecs.v23.i2.pp1159-1169.
V. Jainuri and T. Sukmono, “Optimization of Inventory Cost Using the Continuous Review System (CRS) Method in Controlling the Need for Raw Materials for the Crimean Industry,” Acad. Open, vol. 5, pp. 6–14, 2021, doi: 10.21070/acopen.5.2021.2205.
M. Saiful and F. Achmadi, “Penentuan Quantity Order, Reorder Point Dan Safety Stock Melalui Continuous Review System dalam Situasi Ketidakpastian Permintaan (Studi Kasus : Persediaan Bahan Baku Produksi PT. X),” Semin. Nas. Inov. dan Apl. Teknol. di Ind., vol. 5, no. 3, pp. 236–242, 2019, doi: https://doi.org/10.36040/seniati.v5i3.1074.
R. M. Ariyani, Heriyono, and D. Ekawati, “Mekanisme Pengelolaan Persediaan Sparepart Sepeda Motor Honda Pada PT . Bintang Motor Jaya , Tbk Cabang Cirebon,” J. EXCHALL, vol. 2, no. 1, pp. 71–105, 2020.
An. D. Priyanto, Y. C. Winursito, I. Nugraha, F. Sholeha, and H. S. Fanani, “Minimizing Cost of Milk Raw Material Inventory Using the Economic Order Quantity (EOQ) Method,” PROZIMA (Productivity, Optim. Manuf. Syst. Eng., vol. 7, no. 1, pp. 35–45, 2023, doi: 10.21070/prozima.v7i1.1611.
E. Aryanny and Y. D. Kurniawan, “Analisis Pengendalian Persediaan Suku Cadang Housing Gowl Gravel Pump Warman Dengan Metode Periodic Review dan Continuous Review pada PT. XYZ,” Tekmapro J. Ind. Eng. Manag. Vol.15, vol. 15, no. 01, pp. 13–24, 2020, [Online]. Available: http://tekmapro.upnjatim.ac.id/index.php/tekmapro%0AANALISIS
H. Kartika and C. S. Bakti, “Usulan Perbaikan Persediaan Bearing 6004-2RSL Dengan Metode Economis Order Quantity Pada Divisi Sparepart di PT SI,” J. Ind. Eng. Manag. Res., vol. 1, no. 1, pp. 17–22, 2020.
H. I. Unsulangi, A. H. Jan, and F. Tumewu, “Analisis Economic Order Quantity (EOQ) Pengendalian Persediaan Bahan Baku Kopi Pada PT. Fortuna Inti Alam,” J. EMBA, vol. 7, no. 1, pp. 51–60, 2019.
L. J. Krajewski, M. K. Malhotra, and L. P. Ritzman, Operation Management: Processes and Suply Chains, 11th ed. Pearson, 2016.
S. N. Bahagia, Sistem Inventori. Bandung: Penerbit ITB, 2006.
U. Trisnawati, P. A. W, and D. Pujotomo, “Rancangan Pengendalian Persediaan Spare Part Studi Kasus PT. Indonesia Power Unit Pembangkitan Semarang,” Ind. Eng. Online J., vol. 7, no. 1, 2018.
M. H. Alim, “Analisa Persediaan Bahan Baku Menggunakan Metode Continuous Review System dan Periodic Review System di PT XYZ,” J. Teknol. dan Manaj. Ind. Terap., vol. 1, no. 3, pp. 163–172, 2022.
A. W. Romariardi, M. Mustafid, and S. Suryono, “Penerapan Konsep Continuous Review (Q,r) Pada Model Economic Order Quantity (EOQ) Uutuk Mengoptimalkan Persediaan Bahan Baku Minuman,” J. Sist. Inf. BISNIS, vol. 12, no. 1, pp. 66–72, Sep. 2022, doi: 10.21456/vol12iss1pp66-72.
A. A. Istiningrum, L. M. Munandar, and Sono, “Reducing Spare Part Inventory Cost with Shortage Elimination through Probabilistic Economic Order Quantity,” KINERJA, vol. 25, no. 2, pp. 179–191, Sep. 2021, doi: 10.24002/kinerja.v25i2.4371.
M. H. Baihaqi and Z. F. Rosyada, “Analisis Pengendalian Persediaan Material Suku Cadang Standar Pada Pesawat NC 2121 Dengan Metode EOQ Studi Kasus: PT Dirgantara Indonesia,” Ind. Eng. Online J., vol. 11, no. 4, 2019.
Downloads
Additional Files
Posted
License
Copyright (c) 2023 UMSIDA Preprints Server
This work is licensed under a Creative Commons Attribution 4.0 International License.