Abstract

PT. Varia Usaha Beton produces various kinds of concrete products, construction services, and equipment rental services. The problem that occurs is the decline in the target by 8% in 2022. This was caused by uncontrolled inventory control, so one of the raw materials that experienced an overstock of 15.150 tons was sand in plant BSP Sayung, Central Java. To overcome the supply problem, an alternative or solution is needed, namely using a markov chain with perfect enumeration to determine the amount of sand raw material at a minimum cost and a strategy to minimize the occurrence of excess sand raw material. The research results obtained that policy 58 resulted in an expectation of a minimum monthly excess fee of Rp. 32,463,360 compared to other policies. As a result, the minimum long-term policy is to make improvements if the system is in state 3,4,5, or 6. 

Downloads

Download data is not yet available.

References

M. Y. Tode, E. Hunggurami, dan J. K. Nasjono, “Uji Kuat Tekan Beton Normal Dan Mortar Yang Menggunakan Agregat Maubesi,” J. Tek. Sipil, vol. 9, no. 2, hal. 269–276, 2020, [Daring]. Tersedia pada: http://jurnalakuntansi.petra.ac.id/index.php/jurnal-teknik-sipil/article/view/23280

Maesaroh dan D. Yulia, “PENGARUH PENERAPAN METODE MATERIAL REQUIREMENT PLANNING (MRP) DAN METODE ECONOMIC ORDER QUANTITY (EOQ) TERHADAP EFISIENSI BIAYA BAHAN BAKU,” J. Manag. Stud., vol. 9, no. 3, hal. 133–140, 2022.

S. Muryani, “Sistem Informasi Pengolahan Data Pembelian Bahan Baku,” J. Infortech, vol. 2, no. 1, hal. 110–115, 2020.

M. Nasution, “PERBANDINGAN KUAT TEKAN BETON MENGGUNAKAN AGREGAT HALUS Menggunakan Agregat Halus ( Pasir ) Antara Sungai Tanjung Balai Dan Sungai Kisaran ”,” J. Bid. Apl. Tek. Sipil dan Sains, vol. 1, no. 2, hal. 57–63, 2022.

K. Ismawati, “CLASSIC PROBLEMS : PENGENDALIAN PERSEDIAAN,” J. Ekon. BISNIS DAN KEWIRAUSAHAAN, vol. 8, no. 2, hal. 12–20, 2019.

P. R. Novia, F. Rakhmawati, dan R. Aprilia, “Metode Markov Chain Dalam Pengendalian Persediaan Untuk Perencanaan Biaya Persediaan Bahan Baku Pada Toko Airin Bakery & Cake Shop,” J. Lebesgue J. Ilm. Pendidik. Mat. Mat. dan Stat., vol. 4, no. 1, hal. 391–401, 2023, doi: 10.46306/lb.v4i1.259.

V. Jainuri dan T. Sukmono, “Optimization of Inventory Costs Using the Continuous Review System (CRS) Method in Controlling the Need for Raw Materials for the Crimean Industry,” vol. 5, no. 2, hal. 1–14, 2021, doi: 10.21070/acopen.5.2021.2205.

Oktaviyani, Dwijanto, dan Supriyono, “Optimasi Penjadwalan Produksi dan Perencanaan Persediaan Bahan Baku Menggunakan Rantai Markov (Studi Kasus Kinken Cake & Bakery Kutoharjo),” UNNES J. Math., vol. 7, no. 2, hal. 165–180, 2018, [Daring]. Tersedia pada: http://journal.unnes.ac.id/sju/index.php/ujmUJM7

M. Fatwa, R. Ristu, S. Pandiangan, dan E. Supriyadi, “Pengaplikasian matlab pada perhitungan matriks,” Papanda J. Math. Sci. Res., vol. 1, no. 2, hal. 81–93, 2022.

S. P. Astuti dan T. W. Alhidayatuddiniyah, “Pemanfaatan Software Matrix Laboratory (Matlab) Untuk

Meningkatkan Minat Belajar Mahasiswa Dalam Pembelajaran Fisika Kinematika,” J. Pendidik. Berkarakter, vol. 3, no. 2, hal. 54–57, 2020.

A. Wahid dan M. Munir, “Economic Order Quantity Istimewa pada Industri Krupuk ‘ Istimewa ’ Bangil,” J. Ind. View, vol. 02, no. 01, hal. 1–8, 2020.

Syardianyah, M. Fuad, dan P. Sri, “ANALISIS PENGENDALIAN PERSEDIAAN PRODUKSI PADA CV. FANARA ABADI,” J. Ilm. Manaj., vol. 8, no. 2, hal. 80–91, 2020.

R. Kuswoyo, S. Dur, dan H. Cipta, “Penerapan Proses Stokastik Markov Chain Dalam Pengendalian Persediaan Produksi Kelapa Sawit di Perkebunan Nusantara IV Sumatera Utara,” G-Tech J. Teknol. Terap., vol. 7, no. 2, hal. 429–438, 2023, doi: 10.33379/gtech.v7i2.2025.

R. Prasyayudha, S. Setyawidayat, dan F. Hunaini, “Effectiveness of Minor Overhaul Elimination on Decreasing Cost of Production in Hydroelectric Power Plant,” JEEE-U (Journal Electr. Electron. Eng., vol. 5, no. 1, hal. 71–88, 2021, doi: 10.21070/jeeeu.v5i1.1228.

A. R. Wiranto, A. Faisol, dan Fitriani, “Prediksi Pengeluaran Non Makanan Masyarakat Kabupaten Tulang Bawang Menggunakan Metode Rantai Markov,” J. Stat., vol. 15, no. 1, hal. 203–209, 2022.

Siswanto, Operation Research. 2006.

A. Wahab, A. Syahid, dan J. Junaedi, “Penyajian Data Dalam Tabel Distribusi Frekuensi Dan Aplikasinya Pada Ilmu Pendidikan,” Educ. Learn. J., vol. 2, no. 1, hal. 40, 2021, doi: 10.33096/eljour.v2i1.91.

S. A. Pratama dan B. I. Putra, “Analysis Of Machine Maintenance Using Markov Chain Method For Reducing Maintenance Cost,” Procedia Eng. Life Sci., vol. 3, hal. 208–214, 2022, doi: 10.21070/pels.v3i0.1320.

A. H. Taha, Riset Operasi. 1997.

T. T. Dimyati dan D. Ahmad, OPERATION RESEARCH. 2018.

Posted

2023-08-23