Relayout of Production Facilities with Systematic Layout Planning and Blocplan Methods to Optimize Material Movement Distances
Relayout Fasilitas Produksi dengan Metode Systematic Layout Planning dan Blocplan Guna Mengoptimalkan Jarak Perpindahan Material
DOI:
https://doi.org/10.21070/ups.1599Keywords:
Blocplan, Redisign of Production Facility Layout, Systematic Layout PlanningAbstract
CV. Surya Mega Yokasa is company engaged in the production of shoes. Layout of production facilities in CV. Surya Mega Yokasa is currently not doing well. In designing the layout of the facility, it doesn’t pay attention the flow sequence of material transfer between departments, so the pattern of material flow that is formed becomes an irregular pattern which results in congestion on the material path. Based on this, it integrates Systematic Layout Planning (SLP) method which has more detailed factors such as workflow and qualitative considerations, while the blocplan is a construction method which principally uses computerized calculations which work quite simply in selecting the best layout. The results of this study that the SLP method was chosen as the proposed layout because has greater total reduction in displacement distance of 13,45 m with efficiency increase of 16% to improve the flow of production process in initial layout.
Downloads
References
R. E. Hidayat and B. I. Putra, “Re-Layout Layout of Material Warehouse Using Dedicated Storage Method at PT. A B C,” PROZIMA (Productivity, Optimization and Manufacturing System Engineering), vol. 3, no. 2, pp. 55–61, 2021, doi: 10.21070/prozima.v3i2.1270.
N. Kalim and Lukmandono, “Minimizing Material Handling Costs with the SLP Method and Material Transport Equipment in Steel Pipe Companies,” PROZIMA (Productivity, Optimization and Manufacturing System Engineering), vol. 4, no. 2, pp. 10–16, 2021, doi: 10.21070/prozima.v4i2.1310.
J. A. Tompskins, J. A. (University of A. White, Y. A. ( U. of M. Bozer, and J. M. A. (Purdue U. Tanchoco, Facilities Planning. 2010.
A. D. Budianto and A. S. Cahyana, “Re-Layout Tata Letak Fasilitas Produksi Imitasi Pvc Dengan Menggunakan Metode Systematic Layout Planning Dan Blocplan,” Jurnal Ilmiah Dinamika Teknik, no. 2, pp. 23–32, 2021, [Online]. Available: https://www.unisbank.ac.id/ojs/index.php/ft1/article/view/8738
S. Wignjosoebroto, Tata Letak Pabrik dan Pemindahan Bahan, Keempat. 2009.
J. Laurent, L. Gozali, R. Farrel, and C. O. Doaly, “Production Layout Replanning Using Systematical Layout Planning with Shared Storage Method Analysis and Flexsim Simulation in Garment and Textile Company,” pp. 2159–2171, 2022.
E. B. Prasetyo and A. S. Cahyana, “Re-layout at the SME Crackers Production Section Relayout pada Bagian Produksi IKM Krupuk Seminar Nasional & Call Paper Fakultas Sains dan Teknologi ( SENASAINS 2 nd ),” vol. 1, no. 2, 2021.
S. S. Moch and C. S. Athika, “Relayout Gudang Barang Jadi Untuk Memaksimal Kapasitas Produk Jadi Dengan Menggunakan Metod Activity Relation Chart dan Share Storage,” Spektrum Industri, vol. 15, pp. 185–197, 2015.
H. Setiawan and A. S. Cahyana, “Layout Planning For Production Facilities Using Line Balancing and ARC (Activity Relation Chart) Methods at UD. Agung Mulya,” Procedia of Engineering and Life Science, vol. 1, no. 2, 2021, doi: 10.21070/pels.v1i2.1016.
A. C. Putra, and M. Muslimin, “Furniture XYZ Dengan Metode ARC ( Activity Relationship Chart ) Dan,” vol. 1, no. 3, pp. 32–38, 2021.
B. Nusantara, W. Andalia, and I. Pratiwi, “LINTAS DENGAN METODE ARC DAN ARD ( Studi Kasus PT . Sarana Lalu Lintas ),” vol. 06, no. 01, pp. 37–45, 2023.
H. A. Sudrajat, E. B. Santoso, and F. Debora, “1 , 2 , 3,” vol. 5, no. 2, pp. 44–53, 2021.
B. Saputra, Z. Arifin, and A. Merjani, “Improvement of facility layout using systematic layout planning (slp) method to reduce material movement distance (Case study at UKM Kerupuk Karomah),” Profisiensi, vol. 8, no. 1, pp. 71–82, 2020.
Suseno and R. Fitri, “Analisis Perancangan Ulang Tata Letak Fasilitas Produksi Dengan Menggunakan Metode Systematic Lay Out Planning (SLP) Di PT Adi Satria Abadi” vol. 20, no. 1, pp. 105–123, 2022.
A. Firmansyah, “Desain Relayout Gudang dengan Metode Weighted Distance untuk Meminimasi Travel Time,” Jurnal Sistem Teknik Industri, vol. 22, no. 1, pp. 1–14, 2020, doi: 10.32734/jsti.v22i1.3228.
I. Siregar, K. Syahputri, and R. M. Sari, “Production facility design improvement with BLOCPLAN algorithm,” 2020 4th International Conference on Electrical, Telecommunication and Computer Engineering, ELTICOM 2020 - Proceedings, pp. 40–43, 2020, doi: 10.1109/ELTICOM50775.2020.9230501.
L. N. Sholeha et al., “Perancangan Tata Letak Fasilitas Menggunakan Metode Blocplan ‘Studi Kasus Toko Oleh-Oleh Surabaya Honest,’” Jurnal Ilmiah Teknik dan Manajemen Industri Jurnal Taguchi, vol. 2, no. 2, pp. 2022–249, 2022.
M. M. Abdurrahman, R. Kastaman, and T. Pudjianto, “Rancang Ulang Tata Letak Fasilitas Produksi untuk Efisiensi Produksi Kopi di PT Sinar Mayang Lestari Menggunakan Metode Systematic Layout Planning dan Software Blocplan,” Agrikultura, vol. 32, no. 2, p. 146, 2021, doi: 10.24198/agrikultura.v32i2.33610.
N. T. Yulia and A. S. Cahyana, “Facility Relayout Using Systematic Layout Planning and Blocplan Methods to Minimize Material Handling Distance Relayout Fasilitas Menggunakan Metode Systematic Layout Planning dan Blocplan Guna Meminimasi Jarak Material Handling,” Procedia of engineering and life science, vol. 2, no. 2, 2022.
D. P. Sari and B. Cahyadi, “Relayout Fasilitas Produksi pada Produk Pipe Assy,” Jurnal Universitas Muhammadiyah Jakarta, no. November 2021, pp. 1–9, 2021.
Downloads
Additional Files
Posted
License
Copyright (c) 2023 UMSIDA Preprints Server

This work is licensed under a Creative Commons Attribution 4.0 International License.
