Leather Factory Relayout to Get Optimum Layout


Relayout Pabrik Kulit untuk Mendapatkan Layout Optimum

##article.authors##

DOI:

https://doi.org/10.21070/ups.1567

Keywords:

Relayout, Activity Reliationship Chart, Systematic Layout Planning, Computerized Relative Allocation of Facilities Technique

Abstract

Pt. Carma Wira Jatim Carries Out Production Process Activities Using Machines That Work Especially Hard. A Large Number Of Product Types And The Different Flow Of Production Processes For Each Product Causes A High Level Of Movement Of Good.  So The Purpose Of This Research Is To Design A Better Production Area Layout. The Efficiency Of The Initial Layout With The Proposed Layout Of The Craft And Slp Methods Produces Different Efficiencies. The Craft Method Obtains A Total Of 1041 Moments, While The Slp Method Obtains A Total Of 1045 Moments.

Downloads

Download data is not yet available.

References

R. Fachrizal, “Pengaruh Modal Dan Tenaga Kerja Terhadap Produksi Industri Kerajinan Kulit Di Kabupaten Merauke,” J. Ilm. agribisnis dan Perikan., vol. 9, no. 2, pp. 66–75, 2016.

A. Hadiguna, R. A, Heri Setiawan, Tata Letak Pabrik. Yogyakarta: Graha Ilmu, 2008.

M. P. Meyers, Fred E. Stephens, Manufacturing Facilities Design and Material Handling (Second Edition). New Jersey: Includes index, 2000.

P. Moengin, “Perbaikan Tata Letak Lantai Produksi Menggunakan Metode Simulasi dan Systematic Layout Planning untuk Meminimasi Waktu Produksi di PT. Lestari Teknik Plastikatama,” J. Tek. Ind., vol. 9, no. 3, pp. 136–144, 2019.

H. Purnomo, Perencanaan dan Perancangan Fasilitas. Yogyakarta: Graha Ilmu, 2004.

Wignjosoebroto, Tata Letak dan Pemindahan Bahan. Surabaya: Guna Widya, 1996.

A. Ristono, Perancangan Fasilitas. Surabaya: Guna Widya, 2010.

S. Wignjosoebroto, Ergonomi Studi Gerak dan Waktu. Surabaya: Guna Widya, 2006.

L. Elvira, B. Suhardi, and R. D. Astuti, “Perancangan Ulang Tata Letak Fasilitas Menggunakan Metode Systematic Layout Planning Pada PT Pilar Kekar Plasindo,” Tekinfo J. Ilm. Tek. Ind. dan Inf., vol. 9, no. 1, pp. 34–46, 2021, doi: 10.31001/tekinfo.v9i1.870.

F. E. Susanto and Rusindayanto, “Analysis of Factory Facility Layout Design Using the Craft Algorithm Method At Pt. Focus on Ciptamakmur Bersama, Blitar,” PROZIMA (Productivity, Optim. Manuf. Syst. Eng., vol. 3, no. 2, pp. 1–13, 2021, doi: 10.21070/prozima.v3i2.1267.

M. Mudhofar, H. C. Suroso, A. R. Rahadian, and L. N. Sholekhah, “Perancangan Ulang Tata Letak Fasilitas Produksi dengan Menggunakan Metode Systematic Layout Planning dan CRAFT untuk Mengurangi Biaya Material Handling pada PT . Prima Daya Teknik,” no. Senastitan Iii, 2023.

P. Ulang, T. Letak, M. Metode, P. Tunas, and S. Pacitan, “JURNAL MUHAMMADIYAH RELATIVE ALLOCATION OF FACILITIES TECHNIQUES ) PADA PABRIK,” vol. 4, no. 1, 2023.

E. Rengganis and U. Mauidzoh, “Re-Layout Penempatan Fasilitas Produksi dengan menggunakan Metode Systematic Layout Planning dan Metode 5 S Guna Meminimalkan Biaya Material Handling,” J. Rekayasa Ind., vol. 3, no. 1, pp. 31–40, 2021, doi: 10.37631/jri.v3i1.289.

S. N. Irrawan, R. A. Simanjuntak, and M. Yusuf, “ISSN : 2338-7750 Institut Sains & Teknologi AKPRIND Yogyakarta Jurnal REKAVASI ISSN :,” J. REKAVASI, vol. 7, no. 1, 2019.

D. R. Kiran, “Systematic layout planning,” Prod. Plan. Control, pp. 279–292, 2019, doi: 10.1016/b978-0-12-818364-9.00019-6.

A. Rahmawan and O. Adiyanto, “Perancangan Ulang Tata Letak Fasilitas Produksi UKM Eko Bubut dengan Kolaborasi Pendekatan Konvensional 5 S dan Systematic Layout Planning (SLP),” J. Hum. Teknol., vol. 6, no. 1, pp. 9–17, 2020, doi: 10.34128/jht.v6i1.72.

P. S. Akuntansi, “1* , 2 1,2,” vol. 20, no. 1, pp. 105–123, 2022.

P. Brothers, T. Boyolali, F. T. Kebela, B. Suhardi, C. N. Rosyidi, and I. Adiasa, “Perbaikan Tata Letak Fasilitas Produksi Incoming Material Menggunakan Systematic Layout Planning,” vol. 19, no. 1, pp. 77–84, 2020, doi: 10.20961/performa.19.1.40093

Posted

2023-07-10