Application of BIM with Autodesk Revit to Improve the Efficiency of the X Hospital Project
Penerapan BIM dengan Autodesk Revit untuk Meningkatkan Efisiensi Proyek Rumah Sakit X
DOI:
https://doi.org/10.21070/ups.8725Keywords:
Building Information Modeling (BIM), Autodesk Revit, Construction Efficiency, Quantity Take Off, Project managementAbstract
This study aims to evaluate the effectiveness of implementing Building Information Modeling (BIM) using Autodesk Revit in enhancing the efficiency and accuracy of construction project management, particularly in the development of Hospital X in Sidoarjo. The research methods include a literature review and a comparative analysis between conventional methods and BIM, focusing on cost efficiency, time savings, and the accuracy of Quantity Take-Off (QTO) calculations. The results indicate that BIM outperforms conventional methods. Labor costs using BIM ranged from IDR 217,500 to IDR 271,500, significantly lower than the IDR 1,019,000 incurred with conventional methods, achieving cost savings of up to 78.65%. The volume calculation deviation was also minimal, at only 0.025%. BIM simplifies the 3D modeling of structural elements and produces accurate, fast, and integrated data. Autodesk Revit has proven to improve the efficiency, accuracy, and quality of construction planning in accordance with national technical standards.
Downloads
References
I. S. Santoso, A. Suroso, and M. Amin, “Pengaruh Tingkat Penerapan BIM 5D Terhadap Kinerja Biaya Proyek Konstruksi,” Konstruksia, vol. 14, no. 2, p. 83, 2023, doi: 10.24853/jk.14.2.83-92.
A. Mafrul, “Analisis Penjadwalan Dan Bar Bending Schedule Dengan Building Information Modeling (BIM) Allplan,” Analisis Penjadwalan Dan Bar Bending Schedule Dengan Building Information Modeling (Bim) Allplan, pp. 1–89, 2021, [Online]. Available: http://repository.umsu.ac.id/handle/123456789/16453?show=full
B. J. Nugroho, I. A. Baskoro, and K. W. Widiatmoko, “Penerapan Aplikasi Building Information Modelling (Bim) Pada Proyek Rehabilitasi Dermaga Multifungsi Pulang Pisau,” Teknika, vol. 17, no. 2, p. 117, 2022, doi: 10.26623/teknika.v17i2.5419.
R. Ferial, B. Hidayat, R. C. Pesela, and D. Daoed, “Quantity take-off berbasis building information modeling (bim) studi kasus: gedung bappeda padang,” Jurnal Rekayasa Sipil (JRS-Unand), vol. 17, no. 3, p. 228, 2022, doi: 10.25077/jrs.17.3.228-238.2021.
A. Anjani, H. Riakara Husni, and C. Niken, “Penerapan Building Information Modeling (BIM) Menggunakan Software Autodesk Revit Pada Gedung 4 Rumah Sakit Pendidikan Peguruan Tinggi Negeri (RSPTN) Universitas Lampung,” Jurnal Rekayasa Sipil dan Desain, vol. 10, no. 1,
pp. 87–098, 2022.
F. C. Nugrahini and T. A. Permana, “Building Information Modelling (BIM) dalam Tahapan Desain dan Konstruksi di Indonesia, Peluang Dan Tantangan : Studi Kasus Perluasan T1 Bandara Juanda Surabaya,” Agregat, vol. 5, no. 2, pp. 459–467, 2020, doi: 10.30651/ag.v5i2.6588.
D. Archenita, “Pelatihan Building Information Modeling untuk Peningkatan Kompetensi Mahasiswa Teknik Sipil Universitas Sumatera Utara,” vol. 4, no. 2, pp. 431–438, 2024.
Frenki, F. Y. Mokoagow, and F. Jin Oei, “Perkembangan Bim Dan Dampaknya Pada Transformasi Sektor Konstruksi,” JMTS: Jurnal Mitra Teknik Sipil, vol. 7, no. 2, pp. 443–454, 2024, doi: 10.24912/jmts.v7i2.26805.
D. Setiawan, “Kajian Pembelajaran BIM di Perguruan Tinggi,” Jurnal Civronlit Unbari, vol. 7, no. 1, p. 43, 2022, doi: 10.33087/civronlit.v7i1.96.
M. A. Rizki, H. Hermawan, and A. Wahyuni, “Evaluasi Green Campus Berbasis Bim,” TAPAK (Teknologi Aplikasi Konstruksi) : Jurnal Program Studi Teknik Sipil, vol. 12, no. 2, p. 223, 2023, doi: 10.24127/tp.v12i2.2612.
A. Saputra, H. Riakara Husni, Bayzoni, and A. M. Siregar, “Penerapan Building Information Modeling (BIM) Pada Bangunan Gedung Menggunakan Software Autodesk Revit (Studi Kasus: Gedung 5 RSPTN Universitas Lampung),” Journal Rekayasa Sipil Dan Desain (JRSDD), vol. 10, no. 1, pp. 15–26, 2022, [Online]. Available: https://journal.eng.unila.ac.id/index.php/jrsdd/article/view/2321
P. IPM, A. Rozandi, D. Budiman, Indra Ramdani, and K. E. Vladimirovna, “Implementasi Building Information Modeling (BIM) Pada Proyek Perumahan,” Jurnal TESLINK : Teknik Sipil dan Lingkungan, vol. 4, no. 1,
pp. 1–15, 2022, doi: 10.52005/teslink.v4i1.105.
B. M. Hafizh Abdullah Zain, *, and Gathot Heri Sudibyo, “ANALISIS PERBANDINGAN EFEKTIFITAS METODE KONVENSIONAL DAN BIM PADA ELEMEN STRUKTUR BETON (STUDI KASUS GEDUNG
PELAYANAN PENDIDIKAN FISIP UNSOED),” Jurnal Disprotek, vol. 13, no. 2, pp. 137–145, 2022, doi: 10.34001/jdpt.v12i2.
A. Fikri and Z. Septiropa, “Aplikasi Building Information Modelling (Bim) Dalam Meningkatkan Efektivitas Perhitungan Rencana Anggaran Biaya Struktur,” Seminar Keinsinyuran Program Studi Program Profesi Insinyur, vol. 2, no. 1, pp. 216–222, 2022, doi: 10.22219/skpsppi.v3i1.5064.
Y. Marizan, “Penggunaan Software Autodesk Revit,” Jurnal Ilmiah Beering’s, vol. 06, no. 01, pp. 15–26, 2019.
Sarju, Dwi Vera Asmarayani, and Nindyo Cahyo Kresnanto, “Penilaian Efektivitas Implementasi Building Information Modelling (Bim) Pada Proyek Konstruksi Bangunan Gedung,” Jurnal Teknik Sipil, vol. 16, no. 4,
pp. 247–260, 2022, doi: 10.24002/jts.v16i4.5539.
M. G. A. Rommi Mahendra1, Yuliantini Eka Putri2, “Analisis Perbandingan Quantity Take Off (QTO) Dengan Metode Konvensional Dan Metode Building Information Medelling (BIM) Pada Proyek Pembangunan Kantor Kejaksaan Negeri Baturaja Tahun 2023,” vol. 2, no. 2, pp. 71–81, 2023.
F. N. Laily, H. R. Husni, and B. Bayzoni, “Perbandingan Perhitungan BoQ dengan Menggunakan Revit 2019 Terhadap Perhitungan BoQ dengan Menggunakan Metode Konvensional pada Pekerjaan Struktur (Studi Kasus: Gedung G Fakultas Pertanian Universitas Lampung),” REKAYASA: Jurnal Ilmiah Fakultas Teknik Universitas Lampung, vol. 25, no. 2, pp. 27–31, 2021, doi: 10.23960/rekrjits.v25i2.30.
A. Ebrahim and A. S. Wayal, “BIM Based Building Performance Analysis Of A Green Office Building,” ICRRM 2019 – System Reliability, Quality Control, Safety, Maintenance and Management, no. July, 2020, doi: 10.1007/978-981-13-8507-0.
B. Cheng, J. Li, V. W. Y. Tam, M. Yang, and D. Chen, “A-BIMLCA-
approach-for-estimating-the-greenhouse-gas-emissions-of-largescale- public-buildings-A-case-studySustainability-Switzerland (1).pdf,” 2020.
R. P. Utari and N. Pradana, “Implementasi Sistem Building Information Modeling (BIM) Untuk Analisis Waktu dan Biaya (Studi Kasus Proyek Pembangunan Gedung Rumah Sakit Universitas Islam Malang),” Jurnal Ilmiah Universitas Batanghari Jambi, vol. 23, no. 2, p. 1245, 2023, doi: 10.33087/jiubj.v23i2.3994.
S. Riyadi, F. M. L. Taqwa, A. G. Brillianto, and M. R. A. Simanjuntak, “Analisis Implementasi Teknologi Building Information Modelling (BIM) pada Tahap Perencanaan Bangunan Gedung Istana Kepresidenan Ibu Kota Nusantara (Studi Kasus PT Yodya Karya, Persero),” Jurnal Komposit: Jurnal Ilmu-ilmu Teknik Sipil, vol. 8, no. 2, pp. 279–288, 2024, [Online]. Available: https://ejournal.uika-
bogor.ac.id/index.php/komposit/article/view/15450
Badan Standarisasi Nasional, “SNI 1729-2020: Spesifikasi untuk Bangunan Gedung Baja Struktural,” 1034.
Badan Standarisasi Nasional, “SNI 2847-2019: Persyaratan Beton Struktural Untuk Bangunan Gedung”.
Kementrian Pekerjaan umum dan Perumahan Rakyat, Modul 5: Pemodelan 3D, 4D, 5D, 6D dan 7D Serta Simulasinya dan Level of Development (LOD). 2018.
Downloads
Additional Files
Posted
License
Copyright (c) 2025 UMSIDA Preprints Server

This work is licensed under a Creative Commons Attribution 4.0 International License.
