Project Cost and Time Performance Analysis using the Earned Value Concept Method in Building Shophouse in Papua
Analisa Kinerja Proyek Earned Value Concept dalam Pembangunan Ruko di Papua
DOI:
https://doi.org/10.21070/ups.8673Keywords:
Project Management, Project Performance, Earned Value, Schedule Variance, Cost Performance IndexAbstract
Cost, time, and resource management are critical in construction execution to minimize the risk of project failure. Common issues often arise due to discrepancies between execution and planning, as well as inaccurate cost estimations during the planning phase, leading to budget overruns and schedule delays. This study aims to evaluate project performance using the Earned Value Concept based on weekly progress data from weeks 20, 23, 25, 27, and 30. The analysis results indicate that the project experienced delays, as reflected by SPI values consistently below 1 and negative SV values. Cost efficiency was achieved in the early stages with a CPI of 1.23 but declined to 0.88 by week 30 due to increased actual costs. The project is estimated to be completed in 38 weeks, behind the original plan of 35 weeks, with a total completion cost of Rp22,436,134,730.24, which remains below the initial budget of Rp25,001,696,716.00.
Downloads
References
M. A. Rizki, H. Hermawan, and A. Wahyuni, “Evaluasi Green Campus Berbasis BIM,” TAPAK, vol. 12, no. 2, pp. 223–232, 2023, [Online]. Available: http://u.lipi.go.id/1320332466
B. Susanti, M. Melisah, and I. Juliantina, “Penerapan Konsep Earned Value Pada Proyek Konstruksi Jalan Tol (Studi Kasus Ruas Jalan Tol Kayuagung - Palembang -Betung),” Jurnal Rekayasa Sipil (JRS-Unand), vol. 15, pp. 12–20, 2019.
N. R. Syamsiyah and E. W. Widodo, “Arsitektur Berkelanjutan Gedung Perumda Tirta Ampera Boyolali Berdasarkan Hasil Greenship New Building Versi 1.2,” JRST (Jurnal Riset Sains dan Teknologi), vol. 7, no. 2, p. 133, Sep. 2023, doi: 10.30595/jrst.v7i2.15527.
A. P. Soekiman and A. Soekiman, “Analisis Faktor Penyebab Cost Overruns Pada Proyek Konstruksi Pembangunan Rumah Dan Ruko Di Kota Bandung Dan Cimahi,” Jurnal Rekayasa Sipil (JRS-Unand), vol. 17, no. 1, p. 13, Jul. 2021, doi: 10.25077/jrs.17.1.13-23.2021.
Umam Fikhrul Muhammad, “Pengendalian Biaya dan Waktu Pada Proyek Pembangunan Hibah Perluasan Gedung Sabhara Polres Lamongan,” Dearsip, vol. Vol. 02 No. 02, pp. 93–114, 2022.
Albar F R and Johari J G, “Evaluasi Kinerja Manajemen Konstruksi Proyek Pembangunan Kantor Dinas Kesehatan,” Jurnal Konstruksi, vol. Vol. 21 No. 2, pp. 249–256, 2023.
J. Christopher and D. M. Waty, “Identifikasi Faktor Penyebab Cost Overrun (Pembengkakan Biaya) Pada Proyek Rumah Tinggal,” JMTS: Jurnal Mitra Teknik Sipil, vol. Vol. 4, No. 3, no. 3, pp. 633–640, 2021.
M. O. Geraldine, P. T. Juwono, and E. N. Cahya, “Studi Manajemen Konstruksi Proyek Pembangunan Bendungan Temef Kabupaten Timor Tengah Selatan,” Jurnal Teknologi dan Rekayasa Sumber Daya Air, vol. 3, no. 2, pp. 490–499, Jul. 2023, doi: 10.21776/ub.jtresda.2023.003.02.042.
V. Aramali, H. Sanboskani, G. E. Gibson, M. El Asmar, and N. Cho, “Forward Looking State of the Art Review on Earned Value Management Systems: The Disconnect between Academia and Industry,” Journal of Management in Engineering, vol. 38, no. 3, May 2022, doi: 10.1061/(asce)me.1943-5479.0001019.
R. Muchammad and B. Wicaksono, “Analisis Kinerja Biaya dan Waktu Menggunakan Metode Earned Value Pada Proyek Pembangunan Infrastruktur Laboratorium Tradisional Food GMP Facility (Paket 3),” Akselerasi: Jurnal Ilmiah Teknik Sipil, vol. 3, no. 1, 2021.
K. Salsabilla and A. Andreas, “Analisa Pengendalian Proyek Konstruksi Menggunakan Metode Earned Value dan Earned Schedule, Serta Manajemen Material Studi Kasus di Proyek Ramcang Bangun Rumah Susun Stasiun Tanjung Barat,” 2023.
E. S. A. Embun, I. Khaidir, and E. Rita, “Kajian Pengaruh Manajemen Sumber Daya Terhadap Produktivitas Pelaksanaan Proyek Konstruksi Gedung,” Siklus : Jurnal Teknik Sipil, vol. 10, no. 1, pp. 80–90, Apr. 2024, doi: 10.31849/siklus.v10i1.11534.
Kholili A. A. and Zuhdy Y. A., “Perhitungan Waktu dan Biaya Pelaksanaan Proyek Pembangunan Merial Tower 10 Lantai Rs. Pelni Jakarta Menggunakan Aluminium Formwork,” JURNAL TEKNIK ITS, pp. D34–D39, 2023.
F. M. Ngwai, F. Simba, and J. J. Oyoo, “Influence Of Project Management Practices On Construction Cost Control of Project In Mombasa County,” The Startegic Journal, pp. 314–330, 2019, [Online]. Available: www.strategicjournals.com
M. Proaño Narváez, C. Flores Vázquez, P. Vásquez Quiroz, and M. Avila Calle, “Earned Value Method (EVM) for Construction Projects: Current Application and Future Projections,” Multidisciplinary Digital Publishing Institute (MDPI), vol. 12, no. 3, Mar. 2022, doi: 10.3390/buildings12030301.
A. Irvania, A. Pujiraharjo, and A. Suharyanto, “Artya Irvania, Alwafi Pujiraharjo, Agus Suharyanto Resource Leveling Optimization Using Different Objective Functions on Building Project Resource Leveling Optimization Using Different Objective Functions on Building Project”, doi: 10.32832/astonjadro.v13i1.
Senduk Novatus, Willar Debby, Donny Taju, and Amiman Sheila, “Perbandingan Biaya Pelaksanaan Pekerjaan Beton Pracetak dan Konvensional pada Proyek Rumah Susun,” Jurnal Teknik Sipil Terapan (JTST), vol. 4, no. 2, pp. 58–67, 2022, [Online]. Available: http://jurnal.polimdo.ac.id/
Downloads
Additional Files
Posted
License
Copyright (c) 2025 UMSIDA Preprints Server

This work is licensed under a Creative Commons Attribution 4.0 International License.