Analysis Of New Electricity Installation Project Scheduling Using Pert Method

Analisa Penjadwalan Proyek Pasang Baru Listrik Dengan Metode Pert

##article.authors##

DOI:

https://doi.org/10.21070/ups.7916

Keywords:

Project Scheduling, PERT, Network Diagram

Abstract

Managing time consistency in project implementation is a major challenge at PT Solusi Teknik. Previously, the company budgeted a cost of Rp232,362 for a project that was planned to take 222 minutes. To overcome this problem, the company evaluated several alternative solutions through an analysis of the project plan. This study aims to assess the project plan with a focus on cost efficiency and implementation time. The method used is the Program Evaluation and Review Technique (PERT), a project management tool that functions to plan, organize, also coordinate various activities on a project. Based on the results of the study, the project duration was successfully reduced from 222 minutes to 163 minutes. On the other hand, the project cost also decreased from Rp232,362 to Rp170,608, resulting in savings of Rp61,754 without reducing the quality of the work results. With a probability of success reaching 99%

Downloads

Download data is not yet available.

References

W. A. Hadi and P. D. Karningsih, “Pengembangan Sistem Manajemen Risiko di Badan Perencanaan Pembangunan Daerah (BAPPEDA) Kota Bontang berdasarkan Kerangka ISO 31000,” PROZIMA (Productivity, Optimization and Manufacturing System Engineering), vol. 1, no. 1, pp. 11–16, Jun. 2017, doi: 10.21070/prozima.v1i1.701.

T. E. J. Amu, J. Tjakra, and P. A. K. Prastasis, “Penerapan Metode PERT Dan CPM Dalam Pembangunan Christian Center,” TEKNO, vol. 21, no. 83, pp. 410–419, 2023, doi: https://doi.org/10.35793/jts.v21i83.47507.

S. Perdana and A. Rahman, “Penerapan Manajemen Proyek Dengan Metode Cpm (Critical Path Method) Pada Proyek Pembangunan Spbe,” Jurnal Pengabdian Kepada Masyarakat, vol. 3, no. 1, pp. 242–250, 2019, doi: https://doi.org/10.32696/ajpkm.v3i1.235.

A. Perbandingan Penjadwalan Proyek Dengan Metode CPM, D. Puji Puspitasari, N. Andhi Setyo Purwono, and F. Eddy Poerwodihardjo, “Analisis Perbandingan Penjadwalan Proyek Dengan Metode Cpm, Pert, Kurva-S (Studi Kasus Peningkatan Jalan Menganti Kesugihan),” TEODOLITA : Media Komunikasi Ilmiah Dibidang Teknik, vol. 23, no. 1, pp. 77–89, 2022, doi: 10.53810/jt.v23i1.441.

Eva Dewi Yusdiana dan Inne Satyawisudarini, “Penerapan Metode Pert Dan Cpm Dalam Pelaksanaan Proyek Pembangunan Jalan Paving Untuk Mencapai Efektivitas Waktu Penyelesaian Proyek,” Jurnal Manajemen Dan Bisnis, vol. 2, no. 3, pp. 1–10, 2018, doi: https://doi.org/10.36555/almana.v2i3.149.

F. R. Andardi, “PROKONS: Jurnal Teknik Sipil Analisis Penerapan Sistem Penjadwalan Dengan Metode Pert Pada Proyek Konstruksi (Studi Kasus: Rehabilitasi Dan Peningkatan Infrastruksi Pasar Tradisonal Kota Malang),” PROKONS: Jurnal Teknik Sipil, vol. 14, no. 2, pp. 19–24, 2020, Accessed: Feb. 09, 2025. [Online]. Available: http://jurnal.polinema.ac.id/index.php/PROKONS/article/view/5354

B. Oktrima, “Evaluasi Waktu Penyelesaian Proyek dengan Metode PERT (Project Evaluation and Review Technique) di PT.ConcoPhillips Indonesia (Suban Tie In,April 1-2,2006),” JURNAL SAINTIKA UNPAM, vol. 1, no. 1, pp. 98–107, 2018, Accessed: Feb. 09, 2025. [Online]. Available: https://core.ac.uk/download/pdf/337609884.pdf

J. G. Putra and D. J. Sekarsari, “Analisis Penjadwalan Proyek Gedung Bertingkat Dengan Metode Pert Dan M-Pert Menggunakan Simulasi Monte Carlo,” JMTS: Jurnal Mitra Teknik Sipil, vol. 3, no. 3, pp. 533–546, 2020, Accessed: Feb. 09, 2025. [Online]. Available: https://scholar.google.com/scholar?hl=id&as_sdt=0%2C5&q=ANALISIS+PENJADWALAN+PROYEK+GEDUNG+BERTINGKAT+DENGAN+METODE+PERT+DAN+M-PERT+MENGGUNAKAN+SIMULASI+MONTE+CARLO&btnG=

T. Irwan Julkarnaen, L. Herlina, and J. Teknik Industri Universitas Sultan Ageng Tirtayasa, “Analisa Perbaikan Penjadwalan Perakitan Panel Listrik Dengan Metode CPM dan PERT (Studi Kasus : PT. Mega Karya Engineering).”

T. Iluk, A. Ridwan, and S. Winarto, “Penerapan Metode CPM Dan PERT Pada Gedung Parkir 3 Lantai Grand Pannglima Polim Kediri,” JURMATEKS : Jurnal Manajemen Teknologi & Teknik Sipil, vol. 3, no. 2, pp. 1–15, 2020, doi: 10.30737/jurmateks.

J. Purnomo, E. Krisnaningsih, and D. A. Khadijah, “Optimalisasi Waktu Penjadwalan Pembuatan Sepatu Pullover Model Quesa Dengan Metode Pert,” Jurnal InTent, vol. 1, no. 1, pp. 24–35, 2018, doi: https://doi.org/10.47080/intent.v1i1.246.

W. Febriana and A. Aziz, “Analisis Penjadwalan Proyek Dengan Metode PERT Menggunakan Microsoft Project 2016,” Jurnal Surya Beton, vol. 5, no. 1, 2021, [Online]. Available: http://jurnal.umpwr.ac.id/index.php/suryabeton

N. Rahayu, G. Harta Nugraha, and A. Prabowo, “Evaluasi Penjadwalan Proyek Dengan Metode Pert Pada Pembuatan Pabrik Pt. Daya Kobelco,” Journal Industrial Servicess, vol. 3, no. 2, pp. 9–12, 2018, doi: http://dx.doi.org/10.36055/jiss.v3i2.3161.

T. Ramadhan and ) Sugiyono, “Analisis Optimalisasi Proyek Dengan Menggunakan Metode Pert 1),” pp. 1–20, Dec. 2020, Accessed: Feb. 09, 2025. [Online]. Available: https://www.researchgate.net/publication/34797415

Y. A. K. Arrumih, “Optimalisasi Masalah Penjadwalan Proyek Pembangunan Menggunakan Metode Pert Cpm,” Jurnal Ilmiah Matematika, vol. 8, no. 2716–506X, pp. 1–10, 2020.

B. Leksono, D. Nugroho, and E. I. Yanti, “Optimasi Waktu Pelaksanaan Pembangunan Ruang Praktik Siswa SMK Negeri 1 Duduksampeyan dengan Metode PERT,” WAHANA TEKNIK : Jurnal Keilmuan dan Terapan Teknik, vol. 9, no. 2, pp. 49–61, 2020, Accessed: Feb. 09, 2025. [Online]. Available: https://d1wqtxts1xzle7.cloudfront.net/84239955/5_Jurnal_20Wahana_20Teknik_20Vol_209_No2_49-61-libre.pdf?1650086589=&response-content-disposition=inline%3B+filename%3DOptimasi_Waktu_Pelaksanaan_Pembangunan_R.pdf&Expires=1739112375&Signature=esIXtH365BM4MnnRUPeiPoBkznsgqN-O3NaCloFheejHK9vdjRp1NH9HGx1zVP944E9Z9xiXJmE8i1oSBRfBMxviOi0kN9vg9s92MIFL5gUKq0p8vtJPeu80r6z~ARX9erWnpQ2ejySu5zMdI4taZZJFv1VxIlFYkTvCh8KtrRNQ093KdOxMgUTcAjE71ftCA3oGevpEETTSFnblVwdm~FstFXlpAiS9mw3LgOjq1baSutkDoTWMRn4eLN5wOnskuOARvXsk9vS6Q5lRpsDC3uoVk1D2QyuhymGdQRzbr6QslsMuMDfwl8Te5wTC6obsvF~GAj111z5P3xOzoW9bRg__&Key-Pair-Id=APKAJLOHF5GGSLRBV4ZA

Posted

2025-05-05