Preprint / Version 1

Improvements to the Work System Using the Time Study Method at the Assembly Workstation at PT. Ometraco Arya Samanta

Perbaikan Sistem Kerja Menggunakan Metode Time Study Pada Stasiun assembly Pada P.T Ometraco Arya Samanta

Authors

DOI:

https://doi.org/10.21070/ups.12485

Keywords:

Time Study, Standard Time, Bottleneck, Productivity, Assembly

Abstract

Workload imbalances in production processes often lead to bottlenecks, reducing company productivity. This issue occurs during the assembly process for WB-032 components at PT. Ometraco Arya Samanta because standard times for welding remain unestablished. This study aims to determine standard times, identify bottlenecks, and propose work system improvements utilizing the time study method. Conducted through direct observation with a descriptive quantitative approach, this research collected operator cycle times. Data analysis included uniformity tests, sufficiency tests, performance assessments, and calculating normal time, allowances, and standard time. Results revealed that welding activities caused the bottleneck, recording the longest standard time of 245.6 seconds. Establishing standard times successfully balanced the workflow and improved production efficiency without requiring any additional labor or machinery. Ultimately, implementing the time study method successfully enhanced work system effectiveness. This approach strongly supports a sustainable increase in long-term industrial productivity for the company's future manufacturing assembly operations and targets

References

N. K. K. Silvia Nurhayanti, Agung Dwi Nugroho, “Dampak Motivasi Kerja dan Keselamatan Terhadap Produktivitas,” J. Artif. Intell. Digit. Bus., vol. 4, no. 2, pp. 1610–1617, 2025.

R. Kristiana and R. G. Ramadhan, “Labor Productivity Analysis Using Productivity Rating and Time Study Methods,” Publ. Ris. Orientasi Tek. Sipil, vol. 7, no. 1, pp. 23–30, 2025, doi: 10.26740/proteksi.v7n1.p23-30.

Q. Q. Robi Dohar and N. Andri Silviana, “Analisis Pengukuran Waktu Dengan Metode Time Study (Studi Kasus Pada Proses Produksi UD Zahira Shoes),” J. ARTI (Aplikasi Ranc. Tek. Ind., vol. 20, no. 1, pp. 93–100, 2025, doi: 10.52072/arti.v1i20.1273.

C. Michaela, B. Mambo, and L. E. Siahaan, “Jurnal Transformasi Humaniora NASIONAL : ANALISIS TANTANGAN IMPLEMENTASI AGENDA SDGS DI,” vol. 8, no. 7, pp. 1–8, 2025.

R. C. Cahyani and F. S. Titong, “Analisis Perancangan Sistem Kerja untuk Meningkatkan Keselamatan Kerja pada Pekerja di UKM Puput Pastel,” J. Tek. Ind. Terintegrasi, vol. 8, no. 2, pp. 1741–1748, 2025, doi: 10.31004/jutin.v8i2.43048.

B. B. Situmorang, I. R. Maulia, C. S. Raya, and V. A. Sukma, “Pengaruh Beban Kerja dan Sistem Penghargaan terhadap Kinerja Pegawai,” PPIMAN Pus. Publ. Ilmu Manaj., vol. 2, no. 1, pp. 92–108, 2024.

D. P. S. Kunsing, S. F. N. Tarigan, and R. Abudi, “Analisis produktivitas kerja tenaga kesehatan ebrdasarkan beban kerja dengan menggunakan method time adn motion study di UPTD Puskesmas Banggai Timur Raya Kabupaten Banggai Laut,” J. Kolaboratif Sains, vol. 8, no. 3, pp. 1484–1496, 2025, doi: 10.56338/jks.v8i3.7065.

Ira Fasoha Pasaribu and A. Sugiatna, “Perhitungan Waktu Baku Untuk Menentukan Jumlah Tenaga Kerja Optimal Menggunakan Metode Time Study (Studi Kasus: UKM Baju Rajut Binong Jati),” Sist. J. Ilm. Nas. Bid. Ilmu Tek., vol. 12, no. 1, pp. 40–49, 2024.

R. B. J. Boy Isma Putra, BUKU AJAR ANALISA DAN PERANCANGAN SISTEM KERJA. 2015.

B. I. Putra, R. B. Jakaria, and T. Sukmono, “Ergonomic bench for college students in Indonesia,” AIP Conf. Proc., vol. 2646, no. July 2021, 2023, doi: 10.1063/5.0129652.

E. I. Yuslistyari, D. Marseliana, and A. A. Fidianto, “Penerapan Metode Stopwatch Time Study Untuk Menentukan Waktu Baku Pada Proses Perakitan Tamiya,” vol. 8, no. 1, pp. 53–64, 2025.

M. R. Abdullah, E. Nursanti, and R. D. Myrtanti, “ANALISIS PERHITUNGAN WAKTU BAKU DAN PENERAPAN PRODUKSI AYAM PEDAGING,” vol. 8, no. 2, pp. 409–414, 2025.

H. Zadry, Raimona, S. Lusi, B. Yuliandra, and J. Desto, Analisis Dan Perancangan Sistem Kerja, vol. 53, no. 9. 2015.

D. H. Nova Nur Amaliah, Fahriza Nurul Azizah, “PENGUKURAN PRODUKTIVITAS DAN PENETAPAN WAKTU STANDAR PADA PRODUKSI PALLET MENGGUNAKAN TIME MOTION STUDY DI PT XYZ Nova,” pp. 170–177, 2025.

S. K. Ade Irpan Sabilah, “JAPTI : Jurnal Aplikasi Ilmu Teknik Industri EVALUASI AKURASI METODE WESTINGHOUSE , SHUMARD , DAN PERFORMANCE RATING DALAM PENENTUAN WAKTU BAKU JAPTI : Jurnal Aplikasi Ilmu Teknik Industri Volume 6 , Nomor 2 , September 2025 , pp 69-77,” vol. 6, no. September, pp. 69–77, 2025.

M. S. A. Rifi Wijayanti Dual Arifin, Emma Dwi Ariyani, Achmad Muhammad, Supriyadi Sadikin, “Equivalent Dalam Memproduksi Komponen Bench,” J. Ilm. MEA, vol. 9, no. 1, pp. 3277–3287, 2025.

E. B. M. Tambunan, “Analisis Beban Kerja pada Proses Assembly Produk Bonsai Tree LED Light,” Blend Sains J. Tek., vol. 3, no. 2, pp. 132–137, 2025, doi: 10.56211/blendsains.v3i2.744.

S. A. Hadisaputra and E. P. Putri, “Penentuan Jumlah Tenaga Kerja Guna Meningkatkan Produktifitas pada Bagian Produksi UD. Redline,” J. Tek. Ind. Terintegrasi, vol. 7, no. 1, pp. 64–73, 2024, doi: 10.31004/jutin.v7i1.21887.

Posted

2026-09-30