Analysis of Raw Material Overstock Conditions in Inventory Management

Analisa Kondisi Overstock Bahan Baku dalam Manajemen Persediaan

##article.authors##

DOI:

https://doi.org/10.21070/ups.11872

Keywords:

inventory, MRP, overstock, raw materials

Abstract

School bag company types of raw materials including polyester, canvas, synthetic leather, foam, and supporting accessories. Based on the company's historical data, it was found that raw material overstock conditions in several periods with excess inventory ranging from 30%–35% of actual production needs. This condition has the potential to increase storage costs, tie up working capital, and reduce the quality of raw materials due to excessive storage. This study aims to analyze the overstock conditions of all raw materials based on the Bill of Material (BOM) structure and plan material requirements using the Material Requirement Planning (MRP) method with the Lot Sizing Lot For Lot (LFL) technique. The data used include the Master Production Schedule (MPS), BOM, initial inventory, scheduled receipts, and supplier lead times. The results of the study indicate that the implementation of MRP is able to reduce overstock conditions in all raw material components

Downloads

Download data is not yet available.

References

A. Nasywa, P. Studi, and T. Logistik, “JOURNAL OF INDUSTRIAL INNOVATION AND SAFETY ENGINEERING Analisis Perencanaan Kebutuhan Material Produksi Barang Offshore Menggunakan Metode Material Requirement Planning Pada PT . XYZ,” vol. 03, no. 02, pp. 55–64, 2025.

A. Maulana and S. S. Dahda, “Analisis Pengendalian Persediaan Semen Menggunakan Metode EOQ dan Min-Max untuk Meningkatkan Efisiensi Biaya,” vol. 5, no. 2, pp. 1065–1072, 2026.

T. N. Wiyatno, E. Indriastiningsih, and B. Nugrahadi, “Pengelolaan Persediaan Bahan Baku Menggunakan Metode Economic Order Quantity ( EOQ ) Pada Industri Keramik,” vol. 5, no. 1, pp. 230–237, 2026.

O. Perencanaan et al., “MENGGUNAKAN METODE DISTRIBUTION REQUIREMENT PLANNING di CV . RAHMAD REZEKI,” vol. 08, no. 01, pp. 29–38, 2026.

J. Manurung et al., “Pengaruh Penerapan Material Requirements Planning (MRP) Terhadap Efisiensi Manajemen Persediaan Pada Perusahaan Manufaktur,” Econ. Digit. Bus. Rev., vol. 7, no. 1, pp. 197–207, 2025.

D. Dwi Fitriya Anggaraini and E. Dhartikasari Priyana, “Analisis Pegendalian Persediaan Material Maintenance, Repair, Operations (MRO) Dengan Metode Material Requirement Planning (MRP) dan Metode Min-Max Inventory Control,” J. Teknol. dan Manaj. Ind. Terap., vol. 4, no. 4, pp. 1743–1753, 2025.

H. Suhartono, B. N. Kusuma, and M. A. Akbar, “Perencanaan Optimasi Bahan Baku Benang Polyester Poy Menggunakan Metode Material Requirement Planning Di Pt. Indo Rama Synthetics Tbk,” J. Ind. Eng. Manag., vol. 6, no. 02, pp. 360–372, 2025, doi: 10.47398/just-me.v6i02.154.

S. Nasution, S., Hidayati, “As-Syirkah : Islamic Economics dan Financial Journal,” As-Syirkah Islam. Econ. Financ. J., vol. 3, no. 2, pp. 522–530, 2024, doi: 10.56672/assyirkah.v4i3.454.

Y. Adli et al., “Perencanaan penjadwalan menggunakan requirement planning pada gudang PT . XYZ metode distribution Scheduling planning uses the distribution needs planning method at the warehouse PT . XYZ,” vol. 7, pp. 22–31, 2026, doi: 10.37373/jenius.v7i1.1933.

I. I. J. Rifka Alkhilyatul Ma’rifat, I Made Suraharta, “No Title 済無No Title No Title No Title,” vol. 2, no. 2, pp. 306–312, 2024.

C. Smartadevi and W. Azlia, “Optimalisasi Pengadaan Bahan Baku Menggunakan Material Requirement Planning ( Mrp ) Dengan Pendekatan Lotting,” J. Rekayasa Sist. dan Manaj. Ind., vol. 02, no. 03, pp. 282–292, 2025.

N. A. Nafi, M. Cattleya, and P. A. Islami, “Analisis Perhitungan Dalam Optimalisasi Manajemen Inventori Pada Pengadaan Bahan Baku dengan Metode Safety Stock di PT ABC,” J. Serambi Eng., vol. X, no. 1, pp. 12106–12119, 2025.

R. S. Mau, “Implementasi Distribution Requirement Planing Dan Saving Matrix Untuk Meminimasi Biaya Distribusi Pt. Garuda Food Gorontalo,” J. Renew. Energy Eng., vol. 2, no. 2022, pp. 50–59, 2023, [Online]. Available: https://jurnalvokasi.ung.ac.id/ijree/index.php/ijree/article/view/4

F. R. Oktavianti and F. H. Mustofa, “Rancangan Distribusi Produk Air Mineral Amidis Menggunakan Metode Distribution Requirement Planning (DRP) di Depo Amidis Cirebon,” J. Tek. Ind., vol. 1, pp. 1–10, 2022.

M. F. Sudrajat, L. Halim, T. Elektro, K. Mekatronika, F. T. Industri, and U. K. Parahyangan, “Computer Science | Industrial Engineering | Mechanic Engineering | Civil Engineering J-ENSISTEC ( Journal of Engineering and Sustainable Technology ) Computer Science | Industrial Engineering | Mechanic Engineering | Civil Engineering,” J-ENSISTEC (Journal Eng. Sustain. Technol., vol. 09, no. 01, pp. 725–733, 2024.

P. D. Nusantara, F. Zuli, T. A. Kurniawan, H. Sitorus, K. Kusumawati, and S. B. Nauli, “Implementasi Material Requirements Planning Pada Perencanaan Persediaan Kebutuhan Bahan Baku Roti,” J. Ilm. FIFO, vol. 15, no. 1, p. 10, 2023, doi: 10.22441/fifo.2023.v15i1.002.

O. J. Audia and O. J. Audia, “Perancangan dan Pengembangan Sistem pada Beberapa Proyek di PT X Design and Development of Systems for Several Projects at PT X,” vol. 02, no. 01, pp. 31–40, 2026.

S. A. Nugroho and S. Mundari, “Perencanaan Kebutuhan Bahan Baku Pembuatan Kursi Susun untuk Memenuhi Permintaan Konsumen,” J. Surya Tek., vol. 12, no. 1, pp. 439–449, 2025, doi: 10.37859/jst.v12i1.9389.

A. Febrianto and Sunarso, “Analisis Pengendalian Persediaan Bahan Baku Tepung Terigu dengan Metode Material Requirement Planning pada Boy’s Cake And Bakery di Sukoharjo,” PENG J. Ekon. dan Manaj., vol. 2, no. 3, pp. 3194–3213, 2025, doi: 10.62710/vc248676.

N. Hidayat, A. Putri Sudiyadi, and D. Ariestyaningrum, “Analisis Persediaan Tiga Jenis Beras Terlaris di Toko Beringin Mart Kota Tarakan Dengan Metode ABC (Activity based costing) Berbasis Pom-Qm For Windows,” JIBEMA J. Ilmu Bisnis, Ekon. Manajemen, dan Akunt., vol. 3, no. 1, pp. 1–13, 2025.

L. Hanafiyah, “Pengaruh Material Requirement Planning ( MRP ), Economic Order Quantity ( EOQ ) dan Period Order Quantity ( POQ ) terhadap Efektivitas Pengelolaan Persediaan Bahan Baku Perajin Furniture CV . XYZ,” vol. 6, no. 6, pp. 3254–3264, 2026.

A. M. Mus, N. Affandi, and A. M. Hardianto, “Application of Inventory Management in Raw Material Supplies by Comparing the Mrp Method & the Ddmrp Method in Optical Cable Production at Pt. Communication Cable Systems Indonesia Tbk Cilegon Banten,” Soc. Humanit. Educ. Stud. Conf. Ser., vol. 6, no. 4, pp. 417–429, 2023, doi: 10.20961/shes.v6i4.82555.

R. Maulidi, M. Huda, D. Doto, and B. S. Panulisan, “Analisis Perencanaan Kebutuhan Bahan BakuPallet Kayu Dengan Material RequirmentPlanning Di Pt. Mitra Athmar Berkah,” J. Taguchi, vol. 4, no. 1, pp. 171–181, 2024.

S. S. Lestari, A. . Widodo, T. Soebijono, and H. . Setyawan, “Analisis Metode Penentuan Rencana Kebutuhan Bahan Baku yang,” J. Ris. Mhs. Akunt., vol. X, no. 2, pp. 2715–7016, 2020.

F. Howay, Hanafi Ashad, and Watono, “Material Requirement Planning (MRP) Pada Pekerjaan Proyek Peningkatan Jalan Klasari-Wonosobo Kabupaten Sorong,” J. TESLINK Tek. Sipil dan Lingkung., vol. 7, no. 1, pp. 340–355, 2025, doi: 10.52005/teslink.v1i1.575.

Q. Budiman, S. Mouton, L. Veenhoff, and A. Boersma, “程威特 1 , 吴海涛 1 , 江 帆 2,” J. Inov. Penelit., vol. 1, no. 0.1101/2021.02.25.432866, pp. 1–15, 2021.

N. Aini, B. Sustriawan, L. Arista, E. Mela, and S. Arsyistawa, “Attributes and priority sequence of consumer requirements in designing gluten-free cookies from corn flour,” J. Agroindustri, vol. 13, no. 2, pp. 132–146, 2023, doi: 10.31186/j.agroind.13.2.132-146.

A. Katakalea and P. Balikou, “The Impact of a Standardised Family Constellation Exercise on Parenti ed Individuals - A Qualitative Study,” vol. 9, no. 1, pp. 9–18, doi: 10.26386/obrela.v9i1.365.

M. Eoq and S. Stock, “Analisis Peramalan dan Optimalisasi Persediaan Maklon,” vol. 5, no. 1, pp. 9–16, 2026.

S. A. Perkasa, A. E. Nugraha, and N. Sa, “Analisis Pengendalian Persediaan Bahan Baku Pasir dan Split Menggunakan Metode Statistical Inventory Control pada Industri Beton Ready-Mix,” 2026.

A. W. Suyoto and U. M. Lamongan, “PENERAPAN ANALISIS METODE ECONOMIC ORDER QUANTITY ( EOQ ) DALAM PENGENDALIAN BIAYA PERSEDIAAN BAHAN BAKU PADA CV . SILVER CONVECTION,” vol. 3, no. 1, pp. 30–49, 2026.

R. Setyaudy, “ANALISIS PENGENDALIAN PERSEDIAAN BAHAN BAKU PADA UMKM XYZ DENGAN METODE CONTINUOUS REVIEW SYSTEM,” vol. 3, no. 1, pp. 1010–1017, 2026.

Posted

2026-08-13