Evaluation of Preventive Maintenance Intervals for Top Sealing Machines Using the Reliability Centered Maintenance Method (II)

Evaluasi Interval Preventive Maintenance Mesin Top Sealing Dengan Metode Reliability Centered Maintenance (II)

##article.authors##

DOI:

https://doi.org/10.21070/ups.11556

Keywords:

Preventive Maintenance, Reliability Centered Maintenance (RCM II), Top Sealing Machine, Failure Mode and Effects Analysis (FMEA), Machine Reliability

Abstract

The company has not yet determined preventive maintenance intervals based on component reliability analysis. This study evaluates the optimal preventive maintenance interval for the Top Sealing machine using the Reliability Centered Maintenance (RCM II) method. Critical components were identified through Failure Mode and Effects Analysis (FMEA), followed by reliability analysis using TTF, TTR, MTTF, and MTTR. The results indicate that the heater bar is the most critical component with the highest RPN, and the optimal preventive maintenance interval is 179.20 hours (approximately 25 working days), helping reduce failure risk and machine downtime.

Downloads

Download data is not yet available.

References

F. Arif Mulawarman, ‘Perencanaan Perawatan Mesin Injection Molding dengan Menggunakan Metode Realibility Centered Maintenance di PT. Victory Plastic’, J. Tek. Mesin, vol. 4, no. 3, pp. 99–110, 2016.

Ahmad Amirudin and Ari Zaqi Al Faritzy, ‘Perencanaan Perawatan Mesin Dengan Metode Reliability Centered Maintenance II Di PT Naga Laut Timur’, J. Penelit. Rumpun Ilmu Tek., vol. 2, no. 3, pp. 88–99, Jun. 2023, doi: 10.55606/juprit.v2i3.2016.

J. T. Juwandono and J. Purnama, ‘Analisa Pemeliharaan Mesin Produksi dengan Metode Reliability Centered Maintenance (RCM) dan Age Replacement’, J. Tek. Ind. Terintegrasi, vol. 6, no. 3, pp. 483–492, Jul. 2023, doi: 10.31004/jutin.v6i3.15768.

A. Purwanto, A. D. Megasari, and N. Nuryadi, ‘Evaluasi Manajemen Pemeliharaan Berbasis RCM untuk Peralatan Produksi Berkategori Vital terhadap Keselamatan (Criticality A) dan Proses Produksi (Criticality B) pada PT. EMC di Kabupaten Bojonegoro’, Akad. J. Mhs. Humanis, vol. 5, no. 1, pp. 563–573, 2025, doi: 10.37481/jmh.v5i1.1273.

M. Alif Andrian and W. Wahyudin, ‘Penerapan Perawatan Mesin Die Cut Menggunakan Metode Reliability Centered Maintenance (RCM) di PT Empat Perdana Carton’, STRING (Satuan Tulisan Ris. dan Inov. Teknol., vol. 9, no. 2, p. 194, 2024, doi: 10.30998/string.v9i2.25462.

H. Hidayat, M. Jufriyanto, and A. W. Rizqi, ‘Perancangan RCM (Reliability Centered Maintenance) Untuk Mengurangi Downtime Mesin Pembuat Botol (Studi Kasus PT IGLAS (Persero), Gresik)’, MATRIK, vol. 21, no. 2, p. 157, Mar. 2021, doi: 10.30587/matrik.v21i2.2038.

S. Okwuobi et al., ‘A Reliability-Centered Maintenance Study for an Individual Section-Forming Machine’, Machines, vol. 6, no. 4, p. 50, Oct. 2018, doi: 10.3390/machines6040050.

A. P. Aditia, ‘Analisis Perawatan Mesin Pada Komponen Mobile Crane Kobelco Rk 450 Dengan Metode Reliability Centered Maintenance Ii ( Rcm Ii ) Dan Age Replacement’, no. Rcm Ii, pp. 1–94, 2024.

M. Prabowo and T. Ihsan, ‘Penerapan Metode Reliability Centered Maintenance (Rcm) Untuk Mengoptimalkan Waktu C-Check Casa 212-400 i’, J. Ilm. Tek. dan Manaj. Ind., vol. 3, no. 2, pp. 1639–1650, 2023.

F. Wendyantoro, I. Apriliana, and S. Wulandari, ‘Maintenance System for Overhead Crane Equipment with Reliability Centered Maintenance ( RCM ) II Method and Age replacement [ Sistem Perawatan Alat Overhead Crane Dengan Metode Reliability Centered Maintenance ( RCM ) II Dan Age replacement ]’, pp. 1–13.

M. P. Adillia and Z. F. Rosyada, ‘Analisis Keefektivitas Mesin Stenter Dengan Menggunakan Metode Overall Equipment Effectiveness (OEE) (Studi kasus : Departemen Finishing PT XYZ)’, 2023.

N. H. Ummah and S. S. Dahda, ‘Analisis Efektifitas Kinerja Mesin Cutting Manual Dan Otomatis Menggunakan Metode OEE (Overall Equipment Effectiveness ) Di PT. XYZ’, J. Tek. Ind. J. Has. Penelit. dan Karya Ilm. dalam Bid. Tek. Ind., vol. 8, no. 2, p. 345, 2022, doi: 10.24014/jti.v8i2.19765.

S. Ramadhania, A. S. Dewantara, N. S. Permata, and M. S. P. A. Suroso, ‘Preventive Maintenance Menggunakan Metode Reliability Centered Maintenance Ii Pada Fasilitas Produksi Kritis Perusahaan Baja’, J. REKAYASA Sist. Ind., vol. 10, no. 2, pp. 58–67, Jul. 2025, doi: 10.33884/jrsi.v10i2.9418.

L. Theresia, G. Ranti, Y. Widianty, and Stephani, ‘Implementasi Lean Reliability Centered Maintenance (RCM) untuk Meningkatkan Keandalan Mesin: Studi Kasus PT Pelita Cengkareng Paper (Implementation of Lean Reliability Centered Maintenance (RCM) to Increase Machine Reliability Case: Study of PT Pelita Cen’, J. IPTEK, vol. 7, no. 2, pp. 13–20, 2023.

Roganda Simbolon, Doarjo Simbolon, and Paris Johannes Ginting, ‘Perancangan Interval Perawatan Mesin Secara Preventive Maintenance Dengan Metode Reliability Centered Maintenance ii (rcm ii) Studi Kasus : Pt. Gunung Selamat Lestari’, J. Indones. Sos. Teknol., vol. 1, no. 3, pp. 210–221, Oct. 2020, doi: 10.36418/jist.v1i3.23.

Posted

2026-08-07