Work Improvement to Increase Output Using Time Study Method
Perbaikan Kerja Untuk Meningkatkan Output Menggunakan Metode Time Study
DOI:
https://doi.org/10.21070/ups.11258Keywords:
time study, stopwatch, shoe, lasting, outputAbstract
Factory 2 comprises two sections: the injection machine area and the finishing area. The injection machine section involves bonding the upper to the sole via an injection process. This study focuses on the injection machine area within Factory 2, The research aims to determine and compare the standard output for the lasting process before and after improvements, utilizing the time study method. Pre-improvement measurements showed the following times: Operator 1 (0.75 min), Operator 2 (0.68 min), Operator 3 (0.70 min), Operator 4 (0.70 min), and Operator 5 (0.68 min), resulting in a combined total time of 3.51 minutes. Post-improvement measurements showed: Operator 1 (0.60 min), Operator 2 (0.63 min), Operator 3 (0.60 min), Operator 4 (0.62 min), and Operator 5 (0.60 min), resulting in a combined total time of 3.05 minutes. In conclusion, the standard output was 66 units/hour prior to improvements and 76 units/hour after improvements.
Downloads
References
B. I. dan R. bambang zakaria Putra, Perancangan Sistem Kerja. 2020.
T. Aprianto and Z. M. Rahman, “Kerja Potong Material Pada Perusahaan Kt,” Sist. J. Ilm. Nas. Bid. Ilmu Tek., vol. 11, no. 01, pp. 21–26, 2023.
R. Dwi Lestari, “Jurnal Cakrawala Informasi,” Cakrawala Inf., vol. 1, no. 2, pp. 51–65, 2021.
B. I. P. Faizal Mega Hardiansyah, “ANALISA BEBAN KERJA MENGGUNAKAN WORK SAMPLING DAN NASA TLX UNTUK MENENTUKAN JUMLAH OPERATOR BAGIAN WORK CAGING,” vol. 7, no. 9, pp. 13674–13694, 2022.
A. Hanafie and A. Haslindah, “Secara Langsung Pada Proses Pembuatan Putu,” vol. 17, no. c, pp. 130–135, 2022.
A. V. Baharuddin, W. H. Afris, and Y. I. Saputri, “Pengukuran Waktu Kerja Standar pada Proses Produksi di IKM Donat Kampar Galesong,” J. Agro-industry Eng. Res., vol. 1, no. 1, pp. 58–62, 2022, doi: 10.61844/jaier.v1i1.138.
R. Wahyudi, A. T. Nugraha, and A. S. Kinasih, “Penentuan Waktu Baku dengan Stopwatch Time Study untuk Pengukuran Kerja Operator di PT XYZ Lampung Tengah,” J. Sains dan Apl. Keilmuan Tek. Ind., vol. 3, no. 2, pp. 79–88, 2023, doi: 10.33479/jtiumc.v3i2.76.
H. Hardiansyah, A. Hasibuan, and B. Harahap, “Analisis Beban Kerja dengan Pendekatan Metode Full Time Equivalent (FTE) pada Pembuatan Meja Belajar di CV Setia Abadi,” Fact. J. Ind. Manaj. dan Rekayasa Sist. Ind., vol. 1, no. 2, pp. 67–73, 2022, doi: 10.56211/factory.v1i2.194.
A. Andriani, M. F. Fatchan, and M. A. Qoliq, “Perbaikan Metode Kerja dengan Time and Motion Study Untuk Meningkatkan Produktifitas Produk Vessel Dump Truck HD785 Series,” J. Media Tek. dan Sist. Ind., vol. 9, no. 1, p. 67, 2025, doi: 10.35194/jmtsi.v9i1.3546.
M. Septian and D. Herwanto, “Penentuan target produksi paint roller berdasarkan perhitungan waktu baku menggunakan metode stopwatch time study,” J. Ind. Serv., vol. 7, no. 2, p. 206, 2022, doi: 10.36055/jiss.v7i2.12756.
M. Yunizar Arfiansyah and I. Yuwono, “Pengukuran Waktu Kerja untuk Menentukan Jumlah Tenaga Kerja Optimal pada Pembuatan Neon Box (Studi Kasus: CV. Wibisono Kreatif Media),” vol. 12, no. 1, pp. 117–126, 2025.
N. N. Puri Julianti Agustin1), “PENGUKURAN WAKTU BAKU AKTIVITAS LABELLING DI PERUSAHAAN THIRD PARTY LOGISTIC ( 3PL ) PT X MENGGUNAKAN METODE,” vol. 14, no. 2, pp. 27–32, 2024.
W. A. Marlina and F. Ramadhani, “Pengukuran Kerja di UMKM Penggilingan Padi di Payakumbuh dengan Metode Studi Waktu,” vol. IX, no. 2, pp. 8699–8708, 2024.
L. Larasati and I. M. Burhan, “Standard Time Analysis on The Cutting and Packaging Section of Porridge Sticky Rice ‘ JE LIT A ’ Analisis Waktu Baku Pada Bagian Pemotongan dan Pengemasan Jenang Ketan ‘ JEL ITA ,’” vol. 5, no. 2, pp. 63–74, 2021.
T. I. Rianti, Y. Kurnia, and M. Hilman, “MENENTUKAN WAKTU BAKU UNTUK MENINGKATKAN PRODUKTIVITAS KERJA DALAM PROSES PRODUKSI LEMARI MENGGUNAKAN METODE TIME STUDY PADA IKM IHSAN ALUMUNIUM DI PADAHERANG pada IKM Ihsan Alumunium di,” vol. 02, no. 01, pp. 61–70, 2024.
H. F. S. Yoda Anugrah Nurdiansyah*1, “Optimasi Waktu Standar Kerja Menggunakan Metode Stopwatch,” vol. 5, no. 1, 2023.
Q. Qawariri and N. Andri Silviana, “Analisis Pengukuran Waktu Dengan Metode Time Study (Studi Kasus Pada Proses Produksi UD Zahira Shoes),” J. ARTI (Aplikasi Ranc. Tek. Ind., vol. 20, no. 1, pp. 93–100, 2025, doi: 10.52072/arti.v1i20.1273.
J. Intent et al., “PENERAPAN METODE STOPWATCH TIME STUDY UNTUK MENENTUKAN WAKTU BAKU PADA PROSES PERAKITAN TAMIYA,” vol. 8, no. 1, pp. 53–64, 2025.
Downloads
Additional Files
Posted
Categories
License
Copyright (c) 2026 UMSIDA Preprints Server

This work is licensed under a Creative Commons Attribution 4.0 International License.
