Abstract

PT. XYZ is a heat exchanger manufacturing company facing workload imbalance problems between production stations. The initial condition of the production line shows a line efficiency of only 53% with a high balance delay reaching 47% and a Smoothness Index value of 298.29 indicating a significant workload imbalance that can cause production delays. This study aims to optimize the production line through the integration of the Line Balancing method with the Ranked Positional Weight (RPW) approach and ARENA software simulation. The results of the RPW calculation show that the merger of 7 to 5 work stations successfully increased line efficiency from 53% to 74% and reduced balance delay from 47% to 26%. . The integration of the two methods proved consistent and effective in balancing the workload, reducing idle time and increasing the overall productivity of the production line

Downloads

Download data is not yet available.

References

H. C. Wahyuni, P. T. Industri, F. Teknik, and U. M. Sidoarjo, “Implementasi Metode Objective Matrix (OMAX) Untuk Pengukuran Produktivitas Pada PT.ABC,” vol. 1, no. 1, pp. 17–21, 2017, doi: 10.21070/prozima.v1i1.702.

W. Rpw et al., “Optimasi Lintasan Produksi dengan Metode Ranked Positional Weight ( RPW ) dan Algoritma Genetik ( GA ) TALENTA Conference Series Optimasi Lintasan Produksi dengan Metode Ranked Positional,” vol. 8, no. 1, 2025, doi: 10.32734/ee.v8i1.2650.

A. B. Sulistyo, “PERENCANAAN LINE BALANCING PROSES PRODUKSI PADA SHEARING LINE PLANT DENGAN MENGGUNAKAN METODE,” vol. XVI, no. 1, pp. 49–60, 2022.

C. W. Oktavia et all, “Pendekatan Studi Waktu Dan Line Balancing Dalam Permasalahan Bottleneck di PT. XYZ,” J. Tiarsie, vol. 22, no. 1, 2025.

E. Elfandry and dkk, “Pendekatan Line Balancing dalam Pembuatan Ragum Menggunakan TALENTA Conference Series Pendekatan Line Balancing dalam Pembuatan Ragum Menggunakan Metode Helgeson-,” Talent. Conf. Ser., vol. 3, no. 2, pp. 210–217, 2020, doi: 10.32734/ee.v3i2.995.

E. Novianti and D. Herwanto, “Penerapan Line Balancing Produksi Arm Rear Brake dengan Metode Ranked Positional Weight di PT. Ciptaunggul Karya Abadi,” J. Serambi Eng., vol. 8, no. 2, pp. 5875–5882, 2023, doi: 10.32672/jse.v8i2.5977.

P. Yolanda, K. Panggabean, I. G. Pasaribu, D. C. Atania, A. B. Tarigan, and T. R. Manalu, “Pendekatan Line Balancing Menggunakan Metode Largest Candidate Rule untuk Memperoleh Efisiensi Lintasan Produksi Ragum,” Talent. Conf. Ser. Energy Eng., vol. 8, no. 1, 2025, doi: 10.32734/ee.v8i1.2571.

I. J. Saifudin, “Analisis Line Balancing Menggunakan Metode Region Approach di PT. XYZ,” J. Manaj. Ind. dan Teknol., vol. 03, no. 03, pp. 49–60, 2022.

N. Hasanah, “Analisis Beban Kerja Karyawan Produksi GRC dengan Metode Full Time Equivalent dan,” vol. 2, no. 2, pp. 21–29, 2021.

U. S. Utara, “Perancangan Sistem Pelayanan pada UMKM X Menggunakan Simulasi dengan Software ARENA,” Talent. Conf. Ser. Energy Eng., vol. 7, no. 1, 2024, doi: 10.32734/ee.v7i1.2316.

F. Wijaya and H. Setiawan, “Penggunaan Software Arena Untuk Meminimalisasi Waktu Tunggu Antrian Air Mineral Galon,” pp. 636–644, 2025.

A. F. Fauzi and J. A. S. Z.S, “Productivity Improvement through Line Balancing Measurement in the Loom Section Using the Ranked Positional Weight (RPW) Method,” Indones. J. Innov. Stud., vol. 26, no. 4, pp. 1–9, 2025, doi: 10.21070/ijins.v26i4.1581.

Esa Pratiwi and Agus Nurrokhman, “Perbaikan keseimbangan lini produksi dengan metode regional approach, largest candidate rule dan ranked positional weight,” JENIUS J. Terap. Tek. Ind., vol. 6, no. 2, pp. 177–188, 2025, doi: 10.37373/jenius.v6i2.1698.

F. Processing, “LINE BALANCING ANALYSIS OF FISH MEATBALL PRODUCTION PROCESS AT,” vol. 5, no. 2, pp. 53–61, 2023.

W. Sabardi, R. Pramanda, and D. Suhanda, “PERANCANGAN EFISIENSI LINTASAN PRODUKSI DENGAN MENGGUNAKAN METODE HELGESON-BIRNIE ( RANKED POSITIONAL WEIGHT ) UNTUK MENINGKATKAN KAPASITAS PRODUKSI ( STUDI KASUS PADA UNIT PRODUKSI I SHIFT I PT . SUMBETRI MEGAH ),” J. Ilm. Jurutera, vol. 08, 2021.

S. N. Aftori and E. Krisnawati, “Reduksi Waktu Siklus Produksi Bawang Goreng dengan Pendekatan Lean MAnufacturing,” Prosidia of Enginering, vol. 1, 2023.

O. Waktu, S. Kerja, M. Metode, and T. Study, “Optimasi Waktu Standar Kerja Menggunakan Metode Stopwatch,” vol. 5, no. 1, 2023.

M. Nevenda, L. Mei, C. Wulandari, U. Katolik, and D. Cendika, “MENENTUKAN JUMLAH TENAGA KERJA OPTIMAL PADA PROSES PRODUKSI PT . NRZ PRIMA GASKET,” J. Sains, Tek. dan Stud. Kemasyarakatan, vol. 1, no. 5, pp. 211–222, 2023.

Y. Wulandari, T. Wahyudi, R. Rahmahwati, S. Uslianti, and F. Prima, “Simulation of Queue System of Retirement Fund Retrieval at The Sanggau Post Office During the Covid-19 Pandemic Using Arena Software Simulasi Sistem Antrian Pengambilan Dana Pensiun di Kantor Pos Sanggau Saat Pandemi Covid-19 Menggunakan Software Arena,” vol. 14, no. 1, pp. 89–95, 2021.

Posted

2026-04-27