Preprint has been submitted for publication in journal
Preprint / Version 1

Performance Evaluation Of Production Machinery At PT XYZ Using The Total Productive Maintenance (Tpm) Concept

Evaluasi Kinerja Mesin Produksi PT. XYZ Menggunakan Konsep Total Productive Maintenance (Tpm)

##article.authors##

DOI:

https://doi.org/10.21070/ups.10342

Keywords:

Overall Equipment Effectiveness (OEE), Six Big Losses, total productive maintenance

Abstract

Machine performance measurement is necessary to determine operational effectiveness and identify sources of losses that affect productivity. This study aims to calculate the Overall Equipment Effectiveness (OEE) value and identify the dominant factors causing the low effectiveness of the  (HPP) using a Total Productive Maintenance (TPM) approach. The research was conducted from February to October 2025 through OEE calculation, Six Big Losses analysis, and Ishikawa diagram analysis. The results show that the average OEE value was 59%, which is still below the ideal standard of 85%, with the lowest component being availability at 77%. The Six Big Losses analysis indicates that the most dominant loss originated from equipment failure with an average of 22%, mainly caused by liquid leakage in the machine system.Thus, the low OEE value was primarily caused by high equipment failure, which reduced availability. Therefore,consistent implementation of TPM is required to improve machine reliability and overall effectiveness.

Downloads

Download data is not yet available.

References

F. Kurniawan et al., “Optimalisasi Penerapan Total Productive Maintenance Pada Mesin Mosher I Dengan Metode Overall Equipment Effectiveness,” Jurnal Teknologi dan Manajemen Industri Terapan (JTMIT), vol. 4, no. 1, pp. 1–9, 2025.

S. Priyono, M. Machfud, and A. Maulana, “Penerapan Total Productive Maintenance (TPM) Pada Pabrik Gula Rafinasi di Indonesia (Studi Kasus: PT. XYZ),” Jurnal Aplikasi Bisnis dan Manajemen, vol. 5, no. 2, p. 265, May 2019, doi: 10.17358/jabm.5.2.265.

F. T. Sisiliani, I. Apriliana, and S. Wulandari, “Analysis of the Effectiveness of Batching Plant Machines Using Overall Equipment Effectiveness (OEE) and Analytical Hierarchy Process (AHP) [Analisis Efektivitas Mesin Batching Plant Menggunakan Overall Equipment Effectiveness (OEE) dan Analytical Hierarchy Process (AHP)].”

N. C. Dewi and J. Sudharto, “ANALISIS PENERAPAN TOTAL PRODUCTIVE MAINTENANCE (TPM) DENGAN PERHITUNGAN OVERALL EQUIPMENT EFECTIVENESS (OEE) DAN SIX BIG LOSSES MESIN CAVITEC PT. ESSENTRA SURABAYA (STUDI KASUS PT. ESSENTRA).”

D. P. Gajah Tunggal, T. Suryadi, E. Supriyadi, K. S. Psi, and M. Si, “ANALISIS PENERAPAN TOTAL PRODUCTIVE MAINTENANCE (TPM) PADA MESIN CURING LINE A DENGAN METODE OVERALL EQUIPMENT EVECTIVENESS (OEE) DAN SIX BIG LOSSES ,” TEKNOLOGI, vol. 4, 2021.

A. Firlana Putra, “Penerapan Metode Total Productive Maintenance Dengan Overall Equipment Effectiveness (OEE) Pada Mesin Grinding di PT. VPRK,” 2024. [Online]. Available: https://jurnal.utb.ac.id/index.php/indstrk

Y. Siswanto, T. Hidayat, and D. R. S. Budi, “Analisis Total Productive Maintenance Overall Equipment Effectiveness Moulding PMS Line,” Jurnal Teknologi dan Manajemen, vol. 21, no. 2, pp. 153–162, Aug. 2023, doi: 10.52330/jtm.v21i2.127.

S. Iskandar and R. R. Padmakusumah, “Jurnal Impresi Indonesia (JII) Analisis Progress Implementasi TPM (Total Productive Maintenance) dan Proyeksi Manfaatnya bagi Peningkatan Produktivitas (Studi Kasus pada Perusahaan X)”.

H. Amaruddin, “Analisis Analisis Penerapan Total Productive Maintenance,” EKOMABIS: Jurnal Ekonomi Manajemen Bisnis, vol. 1, no. 02, pp. 141–148, Dec. 2020, doi: 10.37366/ekomabis.v1i02.46.

H. Ardy and W. Widiasih, “Analysis of Bolt Former Machine Effectiveness Using Overall Equipment Effectiveness (OEE) and Six Big Losses s,” PROZIMA (Productivity, Optimization and Manufacturing System Engineering), vol. 8, no. 1, pp. 25–34, Jun. 2024, doi: 10.21070/prozima.v8i1.1688.

M. Agung Pratama, A. Kurniawan, A. Irwan, P. Studi, and T. Mesin, “ANALISIS PENERAPAN TOTAL PRODUCTIVE MAINTENANCE (TPM) MELALUI METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) PADA MESIN PACKER DI PABRIK SEMEN PT. XYZ,” JITEKH, vol. 8, no. 1, pp. 11–21, 2020.

U. N. Harahap, E. Eddy, and C. Nasution, “Analisis peningkatan produktivitas kerja mesin dengan menggunakan metode Total Productive Maintenance (TPM) di PT. Casa Woodworking Industry,” Jurnal VORTEKS, vol. 2, no. 2, pp. 110–114, Oct. 2021, doi: 10.54123/vorteks.v2i2.88.

P. S. Rahmad, “Penerapan Overall Equipment Effectiveness (Oee) Dalam Implementasi Total Productive Maintenance (TPM) (Studi Kasus di Pabrik Gula PT. ‘Y’.) Rahmad 1) , Pratikto 2) , Slamet Wahyudi 2),” 2022.

U. N. Harahap, E. Eddy, and C. Nasution, “Analisis peningkatan produktivitas kerja mesin dengan menggunakan metode Total Productive Maintenance (TPM) di PT. Casa Woodworking Industry,” Jurnal VORTEKS, vol. 2, no. 2, pp. 110–114, Oct. 2021, doi: 10.54123/vorteks.v2i2.88.

D. F. Hidayat, J. Hardono, and W. A. Wijaya, “Analisa Total Productive Maintenance (TPM) Menggunakan Overall Equipment Effectiveness (OEE) Pada Mesin CNC Milling Total Productive Maintenance Analysis to Measure the Overall Equipment Effectiveness (OEE) on a CNC Milling Machine,” vol. 9, no. 2, p. 2020, 2020, [Online]. Available: http://jurnal.umt.ac.id/index.php/jt/index

A. Mutaqiem, D. Soediantono, and S. Staf Dan Komando Angkatan Laut, “Literature Review of Total Productive Maintenance (TPM) and Recommendations for Application in the Defense Industries,” 2022. [Online]. Available: http://www.jiemar.org

V. Indriawanti and M. Bernik, “Analisis Penerapan Total Productive Maintanance (TPM) dengan Menggunakan Metode Overall Equipment Effectiveness (OEE) pada Mesin Printing”.

F. F. Nurdin, “Call for papers dan Seminar Nasional Sains dan Teknologi Ke-2 2023 Fakultas Teknik, Universitas Pelita Bangsa,” vol. 2, no. 1, p. 388, 2023.

G. Muhaemin and A. E. Nugraha, “Penerapan Total Productive Maintenance (TPM) Pada Perawatan Mesin Cutter di PT. XYZ,” Jurnal Ilmiah Wahana Pendidikan, vol. 8, no. 9, pp. 205–219, 2022, doi: 10.5281/zenodo.6645451.

O. T. Ahdiyat and Y. A. Nugroho, ANALISIS KINERJA MESIN BANDSAW MENGGUNAKAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) dan SIX BIG LOSSES PADA PT QUARTINDO SEJATI FURNITAMA,” 2022. [Online]. Available: http://bajangjournal.com/index.php/JCI

A. Savitri and N. Winarsih, “Membangun Keunggulan Kompetitif: Penerapan OEE dan Six Big Losses untuk Meningkatkan Efisiensi Mesin I-12 di PT. BI.” [Online]. Available: https://jurnal.utb.ac.id/index.php/indstrk

H. A. Kristanto and W. Setiafindari, “Analisis Penerapan Total Productive Maintenance Dengan Metode Overall Equipment Effectiveness dan Six Big Loses di Cv Renjana Offset.”

S. Nurcahyo and W. Safitri, “Analisa Overall Equipment Effectiveness Untuk Mengendalikan Six Big Losses Pada Mesin Produksi Part Packing,” JAMBURA, vol. 6, no. 1, 2023, [Online]. Available: http://ejurnal.ung.ac.id/index.php/JIMB

Y. Wijaya, L. P. S. Hartanti, and J. Mulyono, “Pengukuran Kinerja Mesin Cetak Menggunakan Metode Overall Equipment Effectiveness Untuk Mengurangi Six Big Losses ,” Jurnal Tekno Insentif, vol. 16, no. 1, pp. 38–53, Apr. 2022, doi: 10.36787/jti.v16i1.578.

A. Intan Nurardisa, Y. Condro Winursito Universitas Pembangunan, J. Timur Jalan Raya Rungkut Madya, G. Anyar, and J. Timur, “Analysis of Packaging Machine Effectiveness with Overall Equipment Effectiveness and Six Big Losses Analisis Efektivitas Mesin Packaging Menggunakan Metode Overall Equipment Effectiveness dan Six Big Losses ,” vol. 9, no. 1.

A. Wahid, J. Teknik, I. Fakultas, and T. Y. Pasuruan, “Penerapan Total Productive Maintenance (TPM) Produksi Dengan Metode Overall Equipment Effectiveness (OEE) Pada Proses Produksi Botol (PT. XY Pandaan-Pasuruan).”

H. Ariyah Jurusan Teknik Industri, F. Sains dan Teknologi, U. H. Sultan Syarif Kasim Riau Jl Soebrantas No, and S. Baru, “Penerapan Metode Overall Equipment Effectiveness (OEE) Dalam Peningkatan Efisiensi Mesin Batching Plant (Studi Kasus: PT. Lutvindo Wijaya Perkasa),” Jurnal Teknologi dan Manajemen Industri Terapan (JTMIT), vol. 1, pp. 70–77, 2022.

A. M. Majid, P. Moengin, A. W. Laboratorium, and S. Produksi, “Usulan penerapan TPM (Annisa, dkk)”.

Wahyu Hadi Sutiyono, Annisa Fitria, Hilman Adiatma, and Widya Setiafindari, “Pengendalian Kualitas Dengan Menggunakan Metode Seven Tools Untuk Meningkatkan Produktivitas Di PT Jogjatex,” Jurnal Sains dan Teknologi, vol. 2, no. 2, pp. 45–57, Nov. 2023, doi: 10.58169/saintek.v2i2.222.