Preprint has been submitted for publication in journal
Preprint / Version 1

Implementation of Occupational Safety and Health (OSH) in Improving the Performance of Multi-Storey Building Construction Project at UIN Salatiga

Penerapan Keselamatan dan Kesehatan Kerja (K3) Dalam Meningkatkan Kinerja Proyek Pembangunan Gedung Bertingkat UIN Salatiga

##article.authors##

DOI:

https://doi.org/10.21070/ups.10279

Keywords:

Occupational Health and Safety (K3), Project Performance, Simple Linear Regression, Multistory Building, Construction

Abstract

This study analyzes the effect of Occupational Health and Safety (K3) implementation on Project Performance in the UIN Salatiga multistory building project. Using a quantitative approach, primary data were collected from 31 project personnel. Validity (Pearson) and reliability (Cronbach’s Alpha > 0.90) tests confirmed the instruments were reliable. Data were analyzed using Simple Linear Regression, with Natural Log and Square Root transformations to meet the normality assumption (K-S Sig. 0.200). Results show that K3 implementation has a positive and significant effect on Project Performance (Sig. < 0.001), with a very strong correlation (R = 0.922). The coefficient of determination indicates that K3 contributes 85.0% to performance variation. Thus, K3 is a key factor in improving project performance.

Downloads

Download data is not yet available.

References

E. Simanjuntak, A. Pardede, and D. Nainggolan, “Tingkat Penerapan Keselamatan, Kesehatan Kerja dan Lingkungan (K3L) pada Proyek Konstruksi,” Jurnal Eksakta Universitas HKBP Nommensen, vol. 5, no. 2, pp. 12–20, 2021.

M. Zulkarnain, R. Hapsari, and D. Lestari, “Analisis penerapan manajemen keselamatan dan kesehatan kerja pada proyek konstruksi di Indonesia,” Jurnal Studi Rekayasa, vol. 7, no. 1, pp. 19–29, 2023.

Prasetyo, Fahrudin Sugih., Harsono.B, "Evaluasi Implementasi Sistem Manajemen Keselamatan Konstruksi (SMKK) Pada Proyek Waron Hospital." Jurnal Aplikasi Teknik Sipil 23.2 (2025): 147-154.

A. M. Muzhaffar and B. Harsono, “Penanganan Genangan Menggunakan Metode Biopori di Taman Tol Simpang Lawang,” AGREGAT, vol. 10, no. 1, pp. 1274–1279, 2025.

M. A. Priyanto and L. Hidayat, “Evaluasi Penerapan Sistem Manajemen K3 pada Proyek Gedung Bertingkat,” Jurnal Teknik Sipil dan Lingkungan, vol. 8, no. 2, pp. 77–86, 2022.

I. Widiana, N. Sudarma, and A. Sugiarta, “Pengaruh Penerapan Keselamatan dan Kesehatan Kerja terhadap Produktivitas Pekerja Konstruksi,” Jurnal Ilmiah Konstruksi dan Teknologi (JIKT), vol. 9, no. 2, pp. 88–97, 2023.

K. P. U. dan P. R. (PUPR), “Peraturan Menteri PUPR Nomor 10 Tahun 2021 tentang Pedoman Sistem Manajemen Keselamatan Konstruksi,” Kementerian PUPR, Jakarta, 2021.

R. Abidin and N. Sari, “Analisis Efektivitas Penerapan K3 terhadap Produktivitas Pekerja pada Proyek Gedung di Kota Bandung,” Jurnal Rekayasa Konstruksi Mekanika Sipil (JRKMS), vol. 7, no. 1, pp. 15–25, 2021.

C. M. Tam, I. W. Y. Fung, and L. Y. Chan, “Study of Attitude Changes in People After the Implementation of a Safety Management System: The Case of Hong Kong,” Saf. Sci., vol. 75, pp. 1–7, 2015.

A. R. Wirahadikusumah, “Challenges in Implementing Occupational Safety Management in Small Construction Projects,” Procedia Eng., vol. 171, pp. 112–120, 2017.

R. Abbas, M. Latukau, and S. Tahitu, “Analisis Penerapan K3 terhadap Biaya Proyek Konstruksi Bangunan Gedung di Kota Ambon,” Jurnal Simetrik, vol. 8, no. 2, pp. 45–53, 2022.

J. F. Al-Bahar and K. C. Crandall, “Enhancing Construction Project Performance through Safety and Risk Management Integration,” International Journal of Project Management, vol. 42, no. 4, pp. 560–572, 2024.

Sugiyono, Metode Penelitian Kuantitatif, Kualitatif, dan R&D. Bandung: Alfabeta, 2019.

Posted

2026-02-19